MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
Scheduling methods particularly in scheduling a job toward machine capacity is often not optimal in generating the minimum makespan time due to the inappropriate mechanism of determining the schedule from the job. By using an appropriate mechanism on the local search for both of the job order toward...
Main Author: | Hendy Tannady |
---|---|
Format: | Article |
Language: | English |
Published: |
Muhammadiyah University Press
2013-06-01
|
Series: | Jurnal Ilmiah Teknik Industri |
Subjects: | |
Online Access: | http://journals.ums.ac.id/index.php/jiti/article/view/650/391 |
Similar Items
-
MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
by: Hendy Tannady
Published: (2013-06-01) -
FLOW SHOP SCHEDULING BASED ON PALMER-NEH, GUPTA-NEH AND DANNENBRING-NEH ALGORITHMS TO MINIMIZE THE ENERGY COST
by: Masrikhan Masrikhan, et al.
Published: (2021-01-01) -
Minimasi Maskepan Dengan Penjadwalan Produksi Pada Tipe Produksi Berulang
by: Imron Kuswandi
Published: (2012-02-01) -
Analisis Perbandingan Pada Penjadwalan Job Untuk Ketepatan Waktu Proses
by: Pipit Sari Puspita
Published: (2008-02-01) -
Penjadwalan Produksi Untuk Meminimalkan Waktu Produksi Dengan Menggunakan Metode Branch And Bound
by: Nunung Indra Lesmana
Published: (2017-05-01)