MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING

Scheduling methods particularly in scheduling a job toward machine capacity is often not optimal in generating the minimum makespan time due to the inappropriate mechanism of determining the schedule from the job. By using an appropriate mechanism on the local search for both of the job order toward...

Full description

Bibliographic Details
Main Author: Hendy Tannady
Format: Article
Language:English
Published: Muhammadiyah University Press 2013-06-01
Series:Jurnal Ilmiah Teknik Industri
Subjects:
Online Access:http://journals.ums.ac.id/index.php/jiti/article/view/650/391
id doaj-9d8e2356c91e4e46b4369786ac6f2654
record_format Article
spelling doaj-9d8e2356c91e4e46b4369786ac6f26542020-11-24T21:18:18ZengMuhammadiyah University PressJurnal Ilmiah Teknik Industri1412-68692460-40382013-06-0112119MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRINGHendy Tannady0Program Studi Teknik Industri, Universitas Bunda Mulia, IndonesiaScheduling methods particularly in scheduling a job toward machine capacity is often not optimal in generating the minimum makespan time due to the inappropriate mechanism of determining the schedule from the job. By using an appropriate mechanism on the local search for both of the job order towards machine and the recapitulation of the makespan in each job in order to produce the optimal scheduling is proved an effective approach to minimize the error of the end time processes that are too long. This approach is also able to provide the optimal solution for the work planning. This research focuses on the searching for some mechanism design alternatives in job scheduling by employing the makespan recapitulation table of each job on the machine determined by Dannenbring method. The result of this research shows that the smallest possible makespan time is 93, by following the order of job j1-j7-j2-j8-j4-j5-j6-j3, j1-j6-j2-j7-j8-j4-j5-j3 and j1-j6-j2-j4-j8-j7-j5-j3 using hybrid Pi1 earlier mechanism and hybrid Pi2 earlier mechanism.http://journals.ums.ac.id/index.php/jiti/article/view/650/391schedulingmakespanDannenbring methodmechanism
collection DOAJ
language English
format Article
sources DOAJ
author Hendy Tannady
spellingShingle Hendy Tannady
MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
Jurnal Ilmiah Teknik Industri
scheduling
makespan
Dannenbring method
mechanism
author_facet Hendy Tannady
author_sort Hendy Tannady
title MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
title_short MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
title_full MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
title_fullStr MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
title_full_unstemmed MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
title_sort modifikasi mekanisme penentuan penjadwalan job pada metode dannenbring
publisher Muhammadiyah University Press
series Jurnal Ilmiah Teknik Industri
issn 1412-6869
2460-4038
publishDate 2013-06-01
description Scheduling methods particularly in scheduling a job toward machine capacity is often not optimal in generating the minimum makespan time due to the inappropriate mechanism of determining the schedule from the job. By using an appropriate mechanism on the local search for both of the job order towards machine and the recapitulation of the makespan in each job in order to produce the optimal scheduling is proved an effective approach to minimize the error of the end time processes that are too long. This approach is also able to provide the optimal solution for the work planning. This research focuses on the searching for some mechanism design alternatives in job scheduling by employing the makespan recapitulation table of each job on the machine determined by Dannenbring method. The result of this research shows that the smallest possible makespan time is 93, by following the order of job j1-j7-j2-j8-j4-j5-j6-j3, j1-j6-j2-j7-j8-j4-j5-j3 and j1-j6-j2-j4-j8-j7-j5-j3 using hybrid Pi1 earlier mechanism and hybrid Pi2 earlier mechanism.
topic scheduling
makespan
Dannenbring method
mechanism
url http://journals.ums.ac.id/index.php/jiti/article/view/650/391
work_keys_str_mv AT hendytannady modifikasimekanismepenentuanpenjadwalanjobpadametodedannenbring
_version_ 1726009840381198336