THE STEPS USED AT PULL KANBAN SYSTEM IMPLEMENTATION ON A SHOCK ABSORBERS ASSEMBLY LINE TO BILSTEIN SA SIBIU
Main Authors: | Dorin Telea, Octavian Popp Ilie |
---|---|
Format: | Article |
Language: | English |
Published: |
Editura Universităţii din Oradea
2012-05-01
|
Series: | Annals of the Oradea University: Fascicle Management and Technological Engineering |
Online Access: | http://imtuoradea.ro/auo.fmte/files-2012-v1/TCM/Telea Dorin L2.pdf |
Similar Items
-
SOME ASPECTS REGARDING THE IMPLE SOME ASPECTS REGARDING THE ADVANTAGES OF IMPLEMENTATION OF THE PULL KANBAN SYSTEM ON A SHOCK ABSORBERS ASSEMBLY LINE
by: Dorin Telea, et al.
Published: (2012-09-01) -
SOME ASPECTS OF DEVELOPMENT AND PROGRAMMING A WHEELS MOBILE ROBOT USING THE ARDUINO DEVELOPMENT BOARD
by: POPP Ilie, et al.
Published: (2014-05-01) -
A simulation study of CONWIP and kanban pull systems
by: Jian-Ting Lin, et al.
Published: (2008) -
External kanban systems in automotive assembly
by: Zaenglein, Roger (Roger William), 1965-
Published: (2006) -
A Simulation Study of Kanban Levels for Assembly Lines and Systems
Published: (2012)