Analysis of an underground structure settlement risk due to tunneling- A case study from Tabriz, Iran

The tunnel of the Tabriz urban railway line 2 (TURL2), Iran, will pass through an underground commercial center onits way. Too little distance between the tunnel crown and the underground structure foundation will probably cause collapseor excessive settlement during the tunnel construction based on...

Full description

Bibliographic Details
Main Authors: Mohammad Javad Vahdatirad, Hadi Ghodrat, Sara Firouzian, Amin Barari
Format: Article
Language:English
Published: Prince of Songkla University 2010-05-01
Series:Songklanakarin Journal of Science and Technology (SJST)
Subjects:
Online Access:http://www.rdoapp.psu.ac.th/html/sjst/journal/32-2/0125-3395-32-2-145-152.pdf
id doaj-9b3639e7249d42e2a72d842db8a75fa4
record_format Article
spelling doaj-9b3639e7249d42e2a72d842db8a75fa42020-11-24T22:52:36ZengPrince of Songkla UniversitySongklanakarin Journal of Science and Technology (SJST)0125-33952010-05-01322145152Analysis of an underground structure settlement risk due to tunneling- A case study from Tabriz, IranMohammad Javad VahdatiradHadi GhodratSara FirouzianAmin BarariThe tunnel of the Tabriz urban railway line 2 (TURL2), Iran, will pass through an underground commercial center onits way. Too little distance between the tunnel crown and the underground structure foundation will probably cause collapseor excessive settlement during the tunnel construction based on studied geotechnical conditions of the region. In this paper,a method of risk level assessment for various types of structures, such as frame and masonry structures, and various typesof foundation, such as continuous and isolated, is well defined and the risk level is classified. Moreover, the value of theunderground commercial center structure settlement is estimated using both empirical and numerical methods. The settlementrisk level of the commercial center structure is determined based on presented definitions about risk classification ofvarious types of structures. Consequently, tunneling processes in this section need a special monitoring system and consolidationmeasures before the passage of a tunnel boring machine.http://www.rdoapp.psu.ac.th/html/sjst/journal/32-2/0125-3395-32-2-145-152.pdfsettlementrisk assessmenttunnelingempirical methodnumerical method
collection DOAJ
language English
format Article
sources DOAJ
author Mohammad Javad Vahdatirad
Hadi Ghodrat
Sara Firouzian
Amin Barari
spellingShingle Mohammad Javad Vahdatirad
Hadi Ghodrat
Sara Firouzian
Amin Barari
Analysis of an underground structure settlement risk due to tunneling- A case study from Tabriz, Iran
Songklanakarin Journal of Science and Technology (SJST)
settlement
risk assessment
tunneling
empirical method
numerical method
author_facet Mohammad Javad Vahdatirad
Hadi Ghodrat
Sara Firouzian
Amin Barari
author_sort Mohammad Javad Vahdatirad
title Analysis of an underground structure settlement risk due to tunneling- A case study from Tabriz, Iran
title_short Analysis of an underground structure settlement risk due to tunneling- A case study from Tabriz, Iran
title_full Analysis of an underground structure settlement risk due to tunneling- A case study from Tabriz, Iran
title_fullStr Analysis of an underground structure settlement risk due to tunneling- A case study from Tabriz, Iran
title_full_unstemmed Analysis of an underground structure settlement risk due to tunneling- A case study from Tabriz, Iran
title_sort analysis of an underground structure settlement risk due to tunneling- a case study from tabriz, iran
publisher Prince of Songkla University
series Songklanakarin Journal of Science and Technology (SJST)
issn 0125-3395
publishDate 2010-05-01
description The tunnel of the Tabriz urban railway line 2 (TURL2), Iran, will pass through an underground commercial center onits way. Too little distance between the tunnel crown and the underground structure foundation will probably cause collapseor excessive settlement during the tunnel construction based on studied geotechnical conditions of the region. In this paper,a method of risk level assessment for various types of structures, such as frame and masonry structures, and various typesof foundation, such as continuous and isolated, is well defined and the risk level is classified. Moreover, the value of theunderground commercial center structure settlement is estimated using both empirical and numerical methods. The settlementrisk level of the commercial center structure is determined based on presented definitions about risk classification ofvarious types of structures. Consequently, tunneling processes in this section need a special monitoring system and consolidationmeasures before the passage of a tunnel boring machine.
topic settlement
risk assessment
tunneling
empirical method
numerical method
url http://www.rdoapp.psu.ac.th/html/sjst/journal/32-2/0125-3395-32-2-145-152.pdf
work_keys_str_mv AT mohammadjavadvahdatirad analysisofanundergroundstructuresettlementriskduetotunnelingacasestudyfromtabriziran
AT hadighodrat analysisofanundergroundstructuresettlementriskduetotunnelingacasestudyfromtabriziran
AT sarafirouzian analysisofanundergroundstructuresettlementriskduetotunnelingacasestudyfromtabriziran
AT aminbarari analysisofanundergroundstructuresettlementriskduetotunnelingacasestudyfromtabriziran
_version_ 1725665403989917696