Summary: | With the increasing attention given to environmentalism, designing a green closed-loop supply chain network has been recognized as an important issue. In this paper, we consider the facility location problem, in order to reduce the total costs and CO<sub>2</sub> emissions under an uncertain demand and emission rate. Particularly, we are more interested in the risk-averse method for providing more reliable solutions. To do this, we employ a coherent risk measure, conditional value-at-risk, to represent the underlying risk of uncertain demand and CO<sub>2</sub> emission rate. The resulting optimization problem is a 0-1 mixed integer bi-objective programming, which is challenging to solve. We develop an improved reformulation-linearization technique, based on decomposed piecewise McCormick envelopes, to generate lower bounds efficiently. We show that the proposed risk-averse model can generate a more reliable solution than the risk-neutral model, both in reducing penalty costs and CO<sub>2</sub> emissions. Moreover, the proposed algorithm outperforms and classic reformulation-linearization technique in convergence rate and gaps. Numerical experiments based on random data and a ‘real’ case are performed to demonstrate the performance of the proposed model and algorithm.
|