Physical Analysis of the Initial Core and Running-In Phase for Pebble-Bed Reactor HTR-PM
The pebble-bed reactor HTR-PM is being built in China and is planned to be critical in one or two years. At present, one emphasis of engineering design is to determine the fuel management scheme of the initial core and running-in phase. There are many possible schemes, and many factors need to be co...
Main Authors: | Jingyu Zhang, Fu Li, Yuliang Sun |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2017-01-01
|
Series: | Science and Technology of Nuclear Installations |
Online Access: | http://dx.doi.org/10.1155/2017/8918424 |
Similar Items
-
Pebble bed reactors simulation using MCNP: The Chinese HTR-10 reactor
by: SA Hosseini, et al.
Published: (2013-09-01) -
Research on the Computed Tomography Pebble Flow Detecting System for HTR-PM
by: Xin Wan, et al.
Published: (2017-01-01) -
Individual pebble temperature peaking factor due to local pebble arrangement in a pebble bed reactor core
by: Sobes, Vladimir, et al.
Published: (2021) -
Initial prediction of dust production in pebble bed reactors
by: M. Rostamian, et al.
Published: (2011-09-01) -
The Shandong Shidao Bay 200 MWe High-Temperature Gas-Cooled Reactor Pebble-Bed Module (HTR-PM) Demonstration Power Plant: An Engineering and Technological Innovation
by: Zuoyi Zhang, et al.
Published: (2016-03-01)