Physical Analysis of the Initial Core and Running-In Phase for Pebble-Bed Reactor HTR-PM
The pebble-bed reactor HTR-PM is being built in China and is planned to be critical in one or two years. At present, one emphasis of engineering design is to determine the fuel management scheme of the initial core and running-in phase. There are many possible schemes, and many factors need to be co...