THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE
The critical path method (CPM) and linear programming are two closely related operations research techniques. Some of their concepts are presented in this paper in order to review some recent modelling structures that have been particularly valuable in the analysis of project time-cost crashes probl...
Main Authors: | Dražen Barković, Josip Jukić |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Economics in Osijek
2017-01-01
|
Series: | Ekonomski Vjesnik |
Subjects: | |
Online Access: | http://hrcak.srce.hr/file/282998 |
Similar Items
-
Scheduling Project Crashing Time Using Linear Programming Approach: Case Study
by: K. Chitra, et al.
Published: (2017-12-01) -
Minimizing the Pessimistic Time of Activity in Overhaul Project
by: Dražen Barković, et al.
Published: (2019-01-01) -
Using the WinQSB Software in Critical Path Analysis
by: Olga Ioana Amariei, et al.
Published: (2008-10-01) -
Analisis Pertukaran Waktu dan Biaya Menggunakan Metode Time Cost Trade Off (TCTO) pada Proyek Pembangunan Perumahan di PT. X
by: Nailul Izzah
Published: (2018-02-01) -
Perbandingan Penentuan Waktu Baku Menggunakan Metode Time Study dan Critical Path Method (CPM)
by: Suci Miranda, et al.
Published: (2019-07-01)