THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE
The critical path method (CPM) and linear programming are two closely related operations research techniques. Some of their concepts are presented in this paper in order to review some recent modelling structures that have been particularly valuable in the analysis of project time-cost crashes probl...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Economics in Osijek
2017-01-01
|
Series: | Ekonomski Vjesnik |
Subjects: | |
Online Access: | http://hrcak.srce.hr/file/282998 |
id |
doaj-99bacccbe3ce4b4ea675600067f91f35 |
---|---|
record_format |
Article |
spelling |
doaj-99bacccbe3ce4b4ea675600067f91f352020-11-24T23:05:50Zeng Faculty of Economics in OsijekEkonomski Vjesnik0353-359X1847-22062017-01-01302287300THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUEDražen Barković0Josip Jukić1Josip Juraj Strossmayer University of Osijek, Faculty of Economics in Osijek, Osijek, CroatiaCollege of Slavonski Brod, Slavonski Brod, CroatiaThe critical path method (CPM) and linear programming are two closely related operations research techniques. Some of their concepts are presented in this paper in order to review some recent modelling structures that have been particularly valuable in the analysis of project time-cost crashes problems.</p><p>The activities underwent crashing of both the time and cost using linear programming. A simplified representation of a small project and a linear programming model were formulated to represent this system. In addition to being simple, the advantage of this method is that it is applicable to large networks. It allows for a shorter computational time at a lower cost, whereas robustness is increased.http://hrcak.srce.hr/file/282998critical path methodlinear programmingtime crashingmaintenance |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Dražen Barković Josip Jukić |
spellingShingle |
Dražen Barković Josip Jukić THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE Ekonomski Vjesnik critical path method linear programming time crashing maintenance |
author_facet |
Dražen Barković Josip Jukić |
author_sort |
Dražen Barković |
title |
THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE |
title_short |
THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE |
title_full |
THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE |
title_fullStr |
THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE |
title_full_unstemmed |
THE OPTIMIZATION OF TIME AND COST PROCESS TECHNIQUE |
title_sort |
optimization of time and cost process technique |
publisher |
Faculty of Economics in Osijek |
series |
Ekonomski Vjesnik |
issn |
0353-359X 1847-2206 |
publishDate |
2017-01-01 |
description |
The critical path method (CPM) and linear programming are two closely related operations research techniques. Some of their concepts are presented in this paper in order to review some recent modelling structures that have been particularly valuable in the analysis of project time-cost crashes problems.</p><p>The activities underwent crashing of both the time and cost using linear programming. A simplified representation of a small project and a linear programming model were formulated to represent this system. In addition to being simple, the advantage of this method is that it is applicable to large networks. It allows for a shorter computational time at a lower cost, whereas robustness is increased. |
topic |
critical path method linear programming time crashing maintenance |
url |
http://hrcak.srce.hr/file/282998 |
work_keys_str_mv |
AT drazenbarkovic theoptimizationoftimeandcostprocesstechnique AT josipjukic theoptimizationoftimeandcostprocesstechnique AT drazenbarkovic optimizationoftimeandcostprocesstechnique AT josipjukic optimizationoftimeandcostprocesstechnique |
_version_ |
1725625496419434496 |