Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction

In order to reduce the tunnel construction accidents and ensure the safety of personnel, a comprehensive assessment method of tunnel construction risk based on combination weighting and cloud model is constructed according to the characteristics of tunnel construction. The risk assessment index syst...

Full description

Bibliographic Details
Main Authors: Jing-chun Wang*, Jia-qi Liu, Qiang Wei, Peng Wang
Format: Article
Language:English
Published: Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek 2021-01-01
Series:Tehnički Vjesnik
Subjects:
Online Access:https://hrcak.srce.hr/file/365699
id doaj-98f530f2e7814419ae73be1918fcff4b
record_format Article
spelling doaj-98f530f2e7814419ae73be1918fcff4b2021-02-07T21:22:10ZengFaculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek Tehnički Vjesnik1330-36511848-63392021-01-01281203210Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel ConstructionJing-chun Wang*0Jia-qi Liu1Qiang Wei2Peng Wang3College of Civil Engineering, Shijiazhuang TieDao University (STDU), 17 Northeast, Second Inner Ring, Shijiazhuang, Hebei, ChinaCollege of Civil Engineering, Shijiazhuang TieDao University (STDU), 17 Northeast, Second Inner Ring, Shijiazhuang, Hebei, ChinaChina Railway Construction Management Co. Ltd., Beijing, ChinaChina Railway Construction Management Co. Ltd., Beijing, ChinaIn order to reduce the tunnel construction accidents and ensure the safety of personnel, a comprehensive assessment method of tunnel construction risk based on combination weighting and cloud model is constructed according to the characteristics of tunnel construction. The risk assessment index system is established based on researches on engineering geological condition, natural environmental condition, Tunnel engineering design scheme and construction management. On this basis, the tunnel risk is divided into 4 levels and the index risk level standard is proposed. In order to improve the rationality of weighting, a weight calculation method based on AHP, entropy method and Lagrange multiplier method is constructed. Finally, the normal cloud generator is used to form comparison pictures of risk clouds and standard clouds, which demonstrates the risk status of the evaluation indexes at all levels. With reference to Deda Tunnel of Sichuan-Tibet Railway engineering of high integrated risk level, management decision-making is required. The evaluation results are basically consistent with engineering practices, proving that the method has good feasibility and applicability.https://hrcak.srce.hr/file/365699cloud modelcombination weightrisk assessmenttunnel construction
collection DOAJ
language English
format Article
sources DOAJ
author Jing-chun Wang*
Jia-qi Liu
Qiang Wei
Peng Wang
spellingShingle Jing-chun Wang*
Jia-qi Liu
Qiang Wei
Peng Wang
Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
Tehnički Vjesnik
cloud model
combination weight
risk assessment
tunnel construction
author_facet Jing-chun Wang*
Jia-qi Liu
Qiang Wei
Peng Wang
author_sort Jing-chun Wang*
title Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
title_short Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
title_full Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
title_fullStr Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
title_full_unstemmed Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
title_sort risk assessment based on combined weighting-cloud model of tunnel construction
publisher Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
series Tehnički Vjesnik
issn 1330-3651
1848-6339
publishDate 2021-01-01
description In order to reduce the tunnel construction accidents and ensure the safety of personnel, a comprehensive assessment method of tunnel construction risk based on combination weighting and cloud model is constructed according to the characteristics of tunnel construction. The risk assessment index system is established based on researches on engineering geological condition, natural environmental condition, Tunnel engineering design scheme and construction management. On this basis, the tunnel risk is divided into 4 levels and the index risk level standard is proposed. In order to improve the rationality of weighting, a weight calculation method based on AHP, entropy method and Lagrange multiplier method is constructed. Finally, the normal cloud generator is used to form comparison pictures of risk clouds and standard clouds, which demonstrates the risk status of the evaluation indexes at all levels. With reference to Deda Tunnel of Sichuan-Tibet Railway engineering of high integrated risk level, management decision-making is required. The evaluation results are basically consistent with engineering practices, proving that the method has good feasibility and applicability.
topic cloud model
combination weight
risk assessment
tunnel construction
url https://hrcak.srce.hr/file/365699
work_keys_str_mv AT jingchunwang riskassessmentbasedoncombinedweightingcloudmodeloftunnelconstruction
AT jiaqiliu riskassessmentbasedoncombinedweightingcloudmodeloftunnelconstruction
AT qiangwei riskassessmentbasedoncombinedweightingcloudmodeloftunnelconstruction
AT pengwang riskassessmentbasedoncombinedweightingcloudmodeloftunnelconstruction
_version_ 1724280549348999168