Energy Consumption of Self-Compacting Concrete during Mixing and Its Impact on the Yield Stress Measured in the Ready-Mix Concrete Plant

To find the energy required during the mixing process of self-compacting concrete in a ready-mixed concrete plant and correlate the results with the yield stress of concrete. Power consumption required during the mixing of concrete is measured with a wattmeter connected to the mixing unit’s power su...

Full description

Bibliographic Details
Main Authors: V. Arularasi, P. Thamilselvi, Siva Avudaiappan, Erick I. Saavedra Flores
Format: Article
Language:English
Published: Hindawi Limited 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6664577
id doaj-98d7e064225a4af59e6f172ecada252a
record_format Article
spelling doaj-98d7e064225a4af59e6f172ecada252a2021-04-05T00:01:10ZengHindawi LimitedAdvances in Civil Engineering1687-80942021-01-01202110.1155/2021/6664577Energy Consumption of Self-Compacting Concrete during Mixing and Its Impact on the Yield Stress Measured in the Ready-Mix Concrete PlantV. Arularasi0P. Thamilselvi1Siva Avudaiappan2Erick I. Saavedra Flores3Division of Structural EngineeringDivision of Structural EngineeringDepartamento de Ingeniería en Obras CivilesDepartamento de Ingeniería en Obras CivilesTo find the energy required during the mixing process of self-compacting concrete in a ready-mixed concrete plant and correlate the results with the yield stress of concrete. Power consumption required during the mixing of concrete is measured with a wattmeter connected to the mixing unit’s power supply. A coaxial cylinder viscometer is used to measure the yield stress of concrete. The clamp meter measures the power when the impeller rotates inside the coaxial cylinder viscometer, which is filled with concrete. When the impeller rotates in a coaxial cylinder filled with concrete, the power is measured by a clamp meter. Torque is obtained through the power relationship, which is an essential factor in determining the yield stress. The cost of a rheometer is so high that all construction industries, research institutions, and researchers cannot measure rheological parameters. Nowadays, all rheometers are automated; hence, the cost is very high. Tattersall’s approach of power requirement in mixing the concrete and calculating the yield stress reduces the complexity in determining the rheological parameter.http://dx.doi.org/10.1155/2021/6664577
collection DOAJ
language English
format Article
sources DOAJ
author V. Arularasi
P. Thamilselvi
Siva Avudaiappan
Erick I. Saavedra Flores
spellingShingle V. Arularasi
P. Thamilselvi
Siva Avudaiappan
Erick I. Saavedra Flores
Energy Consumption of Self-Compacting Concrete during Mixing and Its Impact on the Yield Stress Measured in the Ready-Mix Concrete Plant
Advances in Civil Engineering
author_facet V. Arularasi
P. Thamilselvi
Siva Avudaiappan
Erick I. Saavedra Flores
author_sort V. Arularasi
title Energy Consumption of Self-Compacting Concrete during Mixing and Its Impact on the Yield Stress Measured in the Ready-Mix Concrete Plant
title_short Energy Consumption of Self-Compacting Concrete during Mixing and Its Impact on the Yield Stress Measured in the Ready-Mix Concrete Plant
title_full Energy Consumption of Self-Compacting Concrete during Mixing and Its Impact on the Yield Stress Measured in the Ready-Mix Concrete Plant
title_fullStr Energy Consumption of Self-Compacting Concrete during Mixing and Its Impact on the Yield Stress Measured in the Ready-Mix Concrete Plant
title_full_unstemmed Energy Consumption of Self-Compacting Concrete during Mixing and Its Impact on the Yield Stress Measured in the Ready-Mix Concrete Plant
title_sort energy consumption of self-compacting concrete during mixing and its impact on the yield stress measured in the ready-mix concrete plant
publisher Hindawi Limited
series Advances in Civil Engineering
issn 1687-8094
publishDate 2021-01-01
description To find the energy required during the mixing process of self-compacting concrete in a ready-mixed concrete plant and correlate the results with the yield stress of concrete. Power consumption required during the mixing of concrete is measured with a wattmeter connected to the mixing unit’s power supply. A coaxial cylinder viscometer is used to measure the yield stress of concrete. The clamp meter measures the power when the impeller rotates inside the coaxial cylinder viscometer, which is filled with concrete. When the impeller rotates in a coaxial cylinder filled with concrete, the power is measured by a clamp meter. Torque is obtained through the power relationship, which is an essential factor in determining the yield stress. The cost of a rheometer is so high that all construction industries, research institutions, and researchers cannot measure rheological parameters. Nowadays, all rheometers are automated; hence, the cost is very high. Tattersall’s approach of power requirement in mixing the concrete and calculating the yield stress reduces the complexity in determining the rheological parameter.
url http://dx.doi.org/10.1155/2021/6664577
work_keys_str_mv AT varularasi energyconsumptionofselfcompactingconcreteduringmixinganditsimpactontheyieldstressmeasuredinthereadymixconcreteplant
AT pthamilselvi energyconsumptionofselfcompactingconcreteduringmixinganditsimpactontheyieldstressmeasuredinthereadymixconcreteplant
AT sivaavudaiappan energyconsumptionofselfcompactingconcreteduringmixinganditsimpactontheyieldstressmeasuredinthereadymixconcreteplant
AT erickisaavedraflores energyconsumptionofselfcompactingconcreteduringmixinganditsimpactontheyieldstressmeasuredinthereadymixconcreteplant
_version_ 1714694349211566080