Pseudo-Steady-State Productivity Formula for a Partially Penetrating Vertical Well in a Box-Shaped Reservoir
For a bounded reservoir with no flow boundaries, the pseudo-steady-state flow regime is common at long-producing times. Taking a partially penetrating well as a uniform line sink in three dimensional space, by the orthogonal decomposition of Dirac function and using Green's function to three-di...
Main Authors: | Jing Lu, Djebbar Tiab |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2010-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2010/907206 |
Similar Items
-
Productivity Formulas for a Partially Penetrating Vertical Well in a Circular Cylinder Drainage Volume
by: Jing Lu, et al.
Published: (2009-01-01) -
Multiple-Wells System Productivity Equations in a Rectangular Reservoir
by: JALAL FARHAN OWAYED, et al.
Published: (2013-12-01) -
Pseudo-Steady-State Parameters for a Well Penetrated by a Fracture with an Azimuth Angle in an Anisotropic Reservoir
by: Guoqiang Xing, et al.
Published: (2019-06-01) -
An Analytical Solution of Partially Penetrating Hydraulic Fractures in a Box-Shaped Reservoir
by: He Zhang, et al.
Published: (2015-01-01) -
Practical solution for stabilized pseudo-steady state productivity index of multiple vertical wells depleting closed reservoirs
by: Salam Al-Rbeawi, et al.
Published: (2020-03-01)