Safety Assessment of High-Risk Operations in Hydroelectric-Project Based on Accidents Analysis, SEM, and ANP
Safety risk analysis and assessment of high-risk work system in hydroelectric project has an important role in safety management. The interactive relationships between human factors and the importance of factors are analyzed and proposed. We analyze the correlation relationship among the factors by...
Main Authors: | Jian-Lan Zhou, Bai Zhe-Hua, Zhi-Yu Sun |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2013-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2013/530198 |
Similar Items
-
A Hybrid Approach for Evaluating Faulty Behavior Risk of High-Risk Operations Using ANP and Evidence Theory
by: Xia-Zhong Zheng, et al.
Published: (2017-01-01) -
Optimal operation of a hydroelectric reservoir
by: Do, Tung Van
Published: (2010) -
DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects
by: Gholamreza Dehdasht, et al.
Published: (2017-08-01) -
DEMATEL-ANP risk assessment in oil and gas construction projects
by: Dedasht, G., et al.
Published: (2017) -
ANP model applying for risk project assessment of office building
by: Trịnh Thùy Anh, et al.
Published: (2020-10-01)