Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
A reasonable maintenance time is vital in the metro shield tunnel maintenance to keep good structural performance and reduce maintenance cost. Lacking predictability, the existing maintenance mode cannot effectively resolve the contradiction between the limited maintenance cost and the growing maint...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-12-01
|
Series: | International Journal of Transportation Science and Technology |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S204604302030023X |
id |
doaj-96415cbc9e0540548d2eacf8c717ef5a |
---|---|
record_format |
Article |
spelling |
doaj-96415cbc9e0540548d2eacf8c717ef5a2020-11-26T13:33:42ZengElsevierInternational Journal of Transportation Science and Technology2046-04302020-12-0194344354Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soilsJunhua Xiao0Jinrong Song1Dong Liang2Lihua Zhai3Xingzhong Nong4Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Tongji University, Shanghai, China; Key Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University, Shanghai, China; Corresponding author at: No. 4800, Cao’an Road, Shanghai, China.Key Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University, Shanghai, ChinaKey Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University, Shanghai, ChinaKey Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University, Shanghai, China; Guangzhou Metro Design & Research Institute Co., Ltd., Guangzhou, Guangdong, ChinaGuangzhou Metro Design & Research Institute Co., Ltd., Guangzhou, Guangdong, ChinaA reasonable maintenance time is vital in the metro shield tunnel maintenance to keep good structural performance and reduce maintenance cost. Lacking predictability, the existing maintenance mode cannot effectively resolve the contradiction between the limited maintenance cost and the growing maintenance need in the future. In this study, the degradation model of metro shield tunnels in soft soils was studied to predict the long-term serviceability. Based on that, a method was proposed to decide the optimal time of preventive maintenance for metro shield tunnels. It was found that the tunnel decay process can be expressed by the inverse exponential function-based prediction model. The cost-benefit analysis method was adopted to determine the optimal preventive maintenance time, considering the maintenance time, the maintenance cost and the maintenance measures adopted. The flow chart of this method and an application example were presented. Results can help metro operation owners to develop more scientific and reasonable preventive maintenance plans for shield tunnels in soft soils.http://www.sciencedirect.com/science/article/pii/S204604302030023XMetro shield tunnelPrediction modelOptimal time of preventive maintenanceCost-benefit analysisSoft soils |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Junhua Xiao Jinrong Song Dong Liang Lihua Zhai Xingzhong Nong |
spellingShingle |
Junhua Xiao Jinrong Song Dong Liang Lihua Zhai Xingzhong Nong Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils International Journal of Transportation Science and Technology Metro shield tunnel Prediction model Optimal time of preventive maintenance Cost-benefit analysis Soft soils |
author_facet |
Junhua Xiao Jinrong Song Dong Liang Lihua Zhai Xingzhong Nong |
author_sort |
Junhua Xiao |
title |
Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils |
title_short |
Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils |
title_full |
Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils |
title_fullStr |
Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils |
title_full_unstemmed |
Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils |
title_sort |
decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils |
publisher |
Elsevier |
series |
International Journal of Transportation Science and Technology |
issn |
2046-0430 |
publishDate |
2020-12-01 |
description |
A reasonable maintenance time is vital in the metro shield tunnel maintenance to keep good structural performance and reduce maintenance cost. Lacking predictability, the existing maintenance mode cannot effectively resolve the contradiction between the limited maintenance cost and the growing maintenance need in the future. In this study, the degradation model of metro shield tunnels in soft soils was studied to predict the long-term serviceability. Based on that, a method was proposed to decide the optimal time of preventive maintenance for metro shield tunnels. It was found that the tunnel decay process can be expressed by the inverse exponential function-based prediction model. The cost-benefit analysis method was adopted to determine the optimal preventive maintenance time, considering the maintenance time, the maintenance cost and the maintenance measures adopted. The flow chart of this method and an application example were presented. Results can help metro operation owners to develop more scientific and reasonable preventive maintenance plans for shield tunnels in soft soils. |
topic |
Metro shield tunnel Prediction model Optimal time of preventive maintenance Cost-benefit analysis Soft soils |
url |
http://www.sciencedirect.com/science/article/pii/S204604302030023X |
work_keys_str_mv |
AT junhuaxiao decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils AT jinrongsong decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils AT dongliang decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils AT lihuazhai decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils AT xingzhongnong decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils |
_version_ |
1724414489217990656 |