Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils

A reasonable maintenance time is vital in the metro shield tunnel maintenance to keep good structural performance and reduce maintenance cost. Lacking predictability, the existing maintenance mode cannot effectively resolve the contradiction between the limited maintenance cost and the growing maint...

Full description

Bibliographic Details
Main Authors: Junhua Xiao, Jinrong Song, Dong Liang, Lihua Zhai, Xingzhong Nong
Format: Article
Language:English
Published: Elsevier 2020-12-01
Series:International Journal of Transportation Science and Technology
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S204604302030023X
id doaj-96415cbc9e0540548d2eacf8c717ef5a
record_format Article
spelling doaj-96415cbc9e0540548d2eacf8c717ef5a2020-11-26T13:33:42ZengElsevierInternational Journal of Transportation Science and Technology2046-04302020-12-0194344354Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soilsJunhua Xiao0Jinrong Song1Dong Liang2Lihua Zhai3Xingzhong Nong4Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Tongji University, Shanghai, China; Key Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University, Shanghai, China; Corresponding author at: No. 4800, Cao’an Road, Shanghai, China.Key Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University, Shanghai, ChinaKey Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University, Shanghai, ChinaKey Laboratory of Road and Traffic Engineering, Ministry of Education, Tongji University, Shanghai, China; Guangzhou Metro Design & Research Institute Co., Ltd., Guangzhou, Guangdong, ChinaGuangzhou Metro Design & Research Institute Co., Ltd., Guangzhou, Guangdong, ChinaA reasonable maintenance time is vital in the metro shield tunnel maintenance to keep good structural performance and reduce maintenance cost. Lacking predictability, the existing maintenance mode cannot effectively resolve the contradiction between the limited maintenance cost and the growing maintenance need in the future. In this study, the degradation model of metro shield tunnels in soft soils was studied to predict the long-term serviceability. Based on that, a method was proposed to decide the optimal time of preventive maintenance for metro shield tunnels. It was found that the tunnel decay process can be expressed by the inverse exponential function-based prediction model. The cost-benefit analysis method was adopted to determine the optimal preventive maintenance time, considering the maintenance time, the maintenance cost and the maintenance measures adopted. The flow chart of this method and an application example were presented. Results can help metro operation owners to develop more scientific and reasonable preventive maintenance plans for shield tunnels in soft soils.http://www.sciencedirect.com/science/article/pii/S204604302030023XMetro shield tunnelPrediction modelOptimal time of preventive maintenanceCost-benefit analysisSoft soils
collection DOAJ
language English
format Article
sources DOAJ
author Junhua Xiao
Jinrong Song
Dong Liang
Lihua Zhai
Xingzhong Nong
spellingShingle Junhua Xiao
Jinrong Song
Dong Liang
Lihua Zhai
Xingzhong Nong
Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
International Journal of Transportation Science and Technology
Metro shield tunnel
Prediction model
Optimal time of preventive maintenance
Cost-benefit analysis
Soft soils
author_facet Junhua Xiao
Jinrong Song
Dong Liang
Lihua Zhai
Xingzhong Nong
author_sort Junhua Xiao
title Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
title_short Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
title_full Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
title_fullStr Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
title_full_unstemmed Decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
title_sort decision method on optimal time of preventive maintenance for metro shield tunnels in soft soils
publisher Elsevier
series International Journal of Transportation Science and Technology
issn 2046-0430
publishDate 2020-12-01
description A reasonable maintenance time is vital in the metro shield tunnel maintenance to keep good structural performance and reduce maintenance cost. Lacking predictability, the existing maintenance mode cannot effectively resolve the contradiction between the limited maintenance cost and the growing maintenance need in the future. In this study, the degradation model of metro shield tunnels in soft soils was studied to predict the long-term serviceability. Based on that, a method was proposed to decide the optimal time of preventive maintenance for metro shield tunnels. It was found that the tunnel decay process can be expressed by the inverse exponential function-based prediction model. The cost-benefit analysis method was adopted to determine the optimal preventive maintenance time, considering the maintenance time, the maintenance cost and the maintenance measures adopted. The flow chart of this method and an application example were presented. Results can help metro operation owners to develop more scientific and reasonable preventive maintenance plans for shield tunnels in soft soils.
topic Metro shield tunnel
Prediction model
Optimal time of preventive maintenance
Cost-benefit analysis
Soft soils
url http://www.sciencedirect.com/science/article/pii/S204604302030023X
work_keys_str_mv AT junhuaxiao decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils
AT jinrongsong decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils
AT dongliang decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils
AT lihuazhai decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils
AT xingzhongnong decisionmethodonoptimaltimeofpreventivemaintenanceformetroshieldtunnelsinsoftsoils
_version_ 1724414489217990656