Perbaikan Min-Max Distribusi Dengan Multiple Criteria ABC Analysis NG-Model Untuk Pengoptimalan List Part Number

PT GMF Aeroasia Tbk. is the largest MRO company in Indonesia. This company has 67 plants worldwide. With the many plants that must be serviced, the complex process of repairing aircraft with spare parts that exceeds 15,000 types. Part distribution is a very big challenge and must be faced by compani...

Full description

Bibliographic Details
Main Authors: Zulhendra Hanif, Muhammad Hisjam, Wakhid Ahmad Jauhari
Format: Article
Language:English
Published: Muhammadiyah University Press 2019-07-01
Series:Jurnal Ilmiah Teknik Industri
Subjects:
MRO
Online Access:http://journals.ums.ac.id/index.php/jiti/article/view/7727
id doaj-95b4f942cdfb4390a75539e870593081
record_format Article
spelling doaj-95b4f942cdfb4390a75539e8705930812020-11-25T00:25:36ZengMuhammadiyah University PressJurnal Ilmiah Teknik Industri1412-68692460-40382019-07-01181647110.23917/jiti.v18i1.77274712Perbaikan Min-Max Distribusi Dengan Multiple Criteria ABC Analysis NG-Model Untuk Pengoptimalan List Part NumberZulhendra Hanif0Muhammad Hisjam1Wakhid Ahmad Jauhari2Universitas Sebelas MaretUniversitas Sebelas MaretUniversitas Sebelas MaretPT GMF Aeroasia Tbk. is the largest MRO company in Indonesia. This company has 67 plants worldwide. With the many plants that must be serviced, the complex process of repairing aircraft with spare parts that exceeds 15,000 types. Part distribution is a very big challenge and must be faced by companies where part distribution is done with multi-stage warehouses. At present the main warehouse has problems with the inefficiency of the min-max distribution system at each plant where the system aims to bond the parts that have the greatest frequency of demand to the sub-warehouse at the plant. This study discusses the improvement of Min-Max distribution with ABC Analysis NG-Model Multiple Criteria which aims to improve the efficiency of the list part number with the frequency of order transfer requests and the most optimal performance at 9 internal plants with the largest part demand activity. The proposed method is known to be able to increase min-max accommodation including, Transfer Order frequency from 23% to 40.80% and weekly delivery performance from 22% to 62.69%. In addition, this method can also reduce the amount of part number on Min-max with the results of Transfer Order accommodation and increased performance from the methods currently used.http://journals.ums.ac.id/index.php/jiti/article/view/7727internal distributionABC classificationNG-Modelmulti-stage warehouseMRO
collection DOAJ
language English
format Article
sources DOAJ
author Zulhendra Hanif
Muhammad Hisjam
Wakhid Ahmad Jauhari
spellingShingle Zulhendra Hanif
Muhammad Hisjam
Wakhid Ahmad Jauhari
Perbaikan Min-Max Distribusi Dengan Multiple Criteria ABC Analysis NG-Model Untuk Pengoptimalan List Part Number
Jurnal Ilmiah Teknik Industri
internal distribution
ABC classification
NG-Model
multi-stage warehouse
MRO
author_facet Zulhendra Hanif
Muhammad Hisjam
Wakhid Ahmad Jauhari
author_sort Zulhendra Hanif
title Perbaikan Min-Max Distribusi Dengan Multiple Criteria ABC Analysis NG-Model Untuk Pengoptimalan List Part Number
title_short Perbaikan Min-Max Distribusi Dengan Multiple Criteria ABC Analysis NG-Model Untuk Pengoptimalan List Part Number
title_full Perbaikan Min-Max Distribusi Dengan Multiple Criteria ABC Analysis NG-Model Untuk Pengoptimalan List Part Number
title_fullStr Perbaikan Min-Max Distribusi Dengan Multiple Criteria ABC Analysis NG-Model Untuk Pengoptimalan List Part Number
title_full_unstemmed Perbaikan Min-Max Distribusi Dengan Multiple Criteria ABC Analysis NG-Model Untuk Pengoptimalan List Part Number
title_sort perbaikan min-max distribusi dengan multiple criteria abc analysis ng-model untuk pengoptimalan list part number
publisher Muhammadiyah University Press
series Jurnal Ilmiah Teknik Industri
issn 1412-6869
2460-4038
publishDate 2019-07-01
description PT GMF Aeroasia Tbk. is the largest MRO company in Indonesia. This company has 67 plants worldwide. With the many plants that must be serviced, the complex process of repairing aircraft with spare parts that exceeds 15,000 types. Part distribution is a very big challenge and must be faced by companies where part distribution is done with multi-stage warehouses. At present the main warehouse has problems with the inefficiency of the min-max distribution system at each plant where the system aims to bond the parts that have the greatest frequency of demand to the sub-warehouse at the plant. This study discusses the improvement of Min-Max distribution with ABC Analysis NG-Model Multiple Criteria which aims to improve the efficiency of the list part number with the frequency of order transfer requests and the most optimal performance at 9 internal plants with the largest part demand activity. The proposed method is known to be able to increase min-max accommodation including, Transfer Order frequency from 23% to 40.80% and weekly delivery performance from 22% to 62.69%. In addition, this method can also reduce the amount of part number on Min-max with the results of Transfer Order accommodation and increased performance from the methods currently used.
topic internal distribution
ABC classification
NG-Model
multi-stage warehouse
MRO
url http://journals.ums.ac.id/index.php/jiti/article/view/7727
work_keys_str_mv AT zulhendrahanif perbaikanminmaxdistribusidenganmultiplecriteriaabcanalysisngmodeluntukpengoptimalanlistpartnumber
AT muhammadhisjam perbaikanminmaxdistribusidenganmultiplecriteriaabcanalysisngmodeluntukpengoptimalanlistpartnumber
AT wakhidahmadjauhari perbaikanminmaxdistribusidenganmultiplecriteriaabcanalysisngmodeluntukpengoptimalanlistpartnumber
_version_ 1725348105030729728