Severe wellbore instability in a complex lithology formation necessitating casing while drilling and continuous circulation system

Abstract Most of drilling hole problems are attributed to wellbore stability issues which adversely cause excessive lost time and cost millions of dollars. The past drilling experiences in Kupal oilfield showed excessive mud losses, kick flows, tight holes and pipe stuck leading to repeated reaming,...

Full description

Bibliographic Details
Main Authors: R. Ashena, A. Elmgerbi, V. Rasouli, A. Ghalambor, M. Rabiei, A. Bahrami
Format: Article
Language:English
Published: SpringerOpen 2020-01-01
Series:Journal of Petroleum Exploration and Production Technology
Subjects:
Online Access:https://doi.org/10.1007/s13202-020-00834-3

Similar Items