A Cyclical Integrated Production and Maintenance Systems Planning with Consideration of Identical Maintenance Periods

Integrating the concepts of maintenance and production planning strategies is one of the most recent and important  issues for the reason of their effects on the final product price. This paper considers different situations for production lines, separately and independently, in or...

Full description

Bibliographic Details
Main Authors: M. Rabbani, M. H. Afrazeh, S. Amini, H. Farrokhi-Asl
Format: Article
Language:fas
Published: Isfahan University of Technology 2018-03-01
Series:Ravish/hā-yi ̒adadī dar Muhandisī
Subjects:
Online Access:http://jcme.iut.ac.ir/browse.php?a_code=A-10-1-42&slc_lang=en&sid=1
id doaj-9498aa5cf4114465b921195f33a9d2fa
record_format Article
spelling doaj-9498aa5cf4114465b921195f33a9d2fa2020-11-24T20:47:25ZfasIsfahan University of Technology Ravish/hā-yi ̒adadī dar Muhandisī2228-76982423-57412018-03-013626378A Cyclical Integrated Production and Maintenance Systems Planning with Consideration of Identical Maintenance PeriodsM. Rabbani0M. H. Afrazeh1S. Amini2H. Farrokhi-Asl3 Department of Industrial Engineering, University of Tehran, Tehran, Iran Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran 2. Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran 3. Department of Inductrial Engineering, Iran University of Science and Technology, Tehran, Iran Integrating the concepts of maintenance and production planning strategies is one of the most recent and important  issues for the reason of their effects on the final product price. This paper considers different situations for production lines, separately and independently, in ordinary time and overtime, assuming possibility of outsourcing. This paper aims to find an optimal maintenance strategy and to integrate maintenance strategy with production planning in batch production environment in order to reduce backorder sales and decrease the production and maintenance cost in the specified planning horizon.  Therefore, a new mathematical formulation is proposed for this problem. The proposed mathematical model is solved with two metaheuristic algorithms, namely simulated annealing and harmony search algorithms, and the obtained results are compared with each other. Regarding numerical results, two applied algorithms show acceptable results and the performance of the algorithms are almost identical.http://jcme.iut.ac.ir/browse.php?a_code=A-10-1-42&slc_lang=en&sid=1Preventive maintenance production planning failure-prone manufacturing systems integrated strategies.
collection DOAJ
language fas
format Article
sources DOAJ
author M. Rabbani
M. H. Afrazeh
S. Amini
H. Farrokhi-Asl
spellingShingle M. Rabbani
M. H. Afrazeh
S. Amini
H. Farrokhi-Asl
A Cyclical Integrated Production and Maintenance Systems Planning with Consideration of Identical Maintenance Periods
Ravish/hā-yi ̒adadī dar Muhandisī
Preventive maintenance
production planning
failure-prone manufacturing systems
integrated strategies.
author_facet M. Rabbani
M. H. Afrazeh
S. Amini
H. Farrokhi-Asl
author_sort M. Rabbani
title A Cyclical Integrated Production and Maintenance Systems Planning with Consideration of Identical Maintenance Periods
title_short A Cyclical Integrated Production and Maintenance Systems Planning with Consideration of Identical Maintenance Periods
title_full A Cyclical Integrated Production and Maintenance Systems Planning with Consideration of Identical Maintenance Periods
title_fullStr A Cyclical Integrated Production and Maintenance Systems Planning with Consideration of Identical Maintenance Periods
title_full_unstemmed A Cyclical Integrated Production and Maintenance Systems Planning with Consideration of Identical Maintenance Periods
title_sort cyclical integrated production and maintenance systems planning with consideration of identical maintenance periods
publisher Isfahan University of Technology
series Ravish/hā-yi ̒adadī dar Muhandisī
issn 2228-7698
2423-5741
publishDate 2018-03-01
description Integrating the concepts of maintenance and production planning strategies is one of the most recent and important  issues for the reason of their effects on the final product price. This paper considers different situations for production lines, separately and independently, in ordinary time and overtime, assuming possibility of outsourcing. This paper aims to find an optimal maintenance strategy and to integrate maintenance strategy with production planning in batch production environment in order to reduce backorder sales and decrease the production and maintenance cost in the specified planning horizon.  Therefore, a new mathematical formulation is proposed for this problem. The proposed mathematical model is solved with two metaheuristic algorithms, namely simulated annealing and harmony search algorithms, and the obtained results are compared with each other. Regarding numerical results, two applied algorithms show acceptable results and the performance of the algorithms are almost identical.
topic Preventive maintenance
production planning
failure-prone manufacturing systems
integrated strategies.
url http://jcme.iut.ac.ir/browse.php?a_code=A-10-1-42&slc_lang=en&sid=1
work_keys_str_mv AT mrabbani acyclicalintegratedproductionandmaintenancesystemsplanningwithconsiderationofidenticalmaintenanceperiods
AT mhafrazeh acyclicalintegratedproductionandmaintenancesystemsplanningwithconsiderationofidenticalmaintenanceperiods
AT samini acyclicalintegratedproductionandmaintenancesystemsplanningwithconsiderationofidenticalmaintenanceperiods
AT hfarrokhiasl acyclicalintegratedproductionandmaintenancesystemsplanningwithconsiderationofidenticalmaintenanceperiods
AT mrabbani cyclicalintegratedproductionandmaintenancesystemsplanningwithconsiderationofidenticalmaintenanceperiods
AT mhafrazeh cyclicalintegratedproductionandmaintenancesystemsplanningwithconsiderationofidenticalmaintenanceperiods
AT samini cyclicalintegratedproductionandmaintenancesystemsplanningwithconsiderationofidenticalmaintenanceperiods
AT hfarrokhiasl cyclicalintegratedproductionandmaintenancesystemsplanningwithconsiderationofidenticalmaintenanceperiods
_version_ 1716810103897718784