Implementation of Background Subtraction and Fuzzy Logic Control for Green-Timing Optimization on 3-Junction Traffic Light
This study presents a green-timing optimization simulation on a 3-lane traffic light to reduce the density of the vehicle queue (density) in each lane. The method used in green-timing optimization is a combination of background subtraction and fuzzy logic control. Background subtraction functions as...
Main Author: | Dharmawan - |
---|---|
Format: | Article |
Language: | English |
Published: |
Institut Teknologi Sepuluh Nopember
2019-05-01
|
Series: | JAREE (Journal on Advanced Research in Electrical Engineering) |
Online Access: | http://jaree.its.ac.id/index.php/jaree/article/view/61 |
Similar Items
-
Traffic junctions signal control by fuzzy logic
by: Deng, Ren Zhao, et al.
Published: (1996) -
Hardware Implementation of Real-time Robust Background Subtraction
by: Jen-Shiuan Kao, et al.
Published: (2012) -
Traffic Junction Signal Control by Using Fuzzy Logic and Genetic Algorithm
by: Jen-Yu Li, et al.
Published: (1999) -
Robust Background Subtraction with Foreground Validation for Urban Traffic Video
by: Cheung Sen-Ching S, et al.
Published: (2005-01-01) -
Background Subtraction for Time of Flight Imaging
by: Javier Giacomantone, et al.
Published: (2017-10-01)