Predictive Duty Cycle of Maximum Power Point Tracking Based on Artificial Neural Network and Bootstrap Method for Hybrid Photovoltaic/ Wind Turbine System Considering Limitation Voltage of Grid
In this paper, we propose a new control-based the neural network and bootstrap method to get the predictive duty cycle for the maximum power point of hybrid Photovoltaic (PV) and Wind Turbine generator system (WTG) connected to 380 V grid. The neural network is designed to be controller by learning...
Main Authors: | Feby Agung Pamuji, Nurvita Arumsari, Mochamad Ashari, Hery Suryoatmojo, Soedibyo Soedibyo |
---|---|
Format: | Article |
Language: | English |
Published: |
Institut Teknologi Sepuluh Nopember
2020-10-01
|
Series: | JAREE (Journal on Advanced Research in Electrical Engineering) |
Online Access: | http://jaree.its.ac.id/index.php/jaree/article/view/119 |
Similar Items
-
Kontrol Tegangan pada Sistem Hybrid Panel Surya-Turbin Angin Menggunakan Manajemen Penyimpanan Baterai
by: Soedibyo Soedibyo, et al.
Published: (2020-12-01) -
Desain Kontrol Multi – Input DC–DC Converter Sistem Hibrid Turbin Angin dan Sel Surya Menggunakan Kontrol Fuzzy Logic untuk Tegangan Rendah
by: Feby Agung Pamuji, et al.
Published: (2015-09-01) -
PERAMALAN IRRADIANCE CAHAYA MATAHARI PADA SEL SURYA UNTUK MEMENUHI KEBUTUHAN ENERGI LISTRIK DENGAN METODE SUPPORT VECTOR REGRESSION (SVR)
by: Nurvita Arumsari, et al.
Published: (2017-03-01) -
Integration of Hybrid PV/Wind Generation System Using Fuzzy MPPT in Grid Connected System for Remote Area
by: Soedibyo, et al.
Published: (2016-01-01) -
MPPT Control System Based on Incremental Conductance and Constant Voltage using Coupled Inductor-Capacitor Zeta Converter in hybrid PV-Wind Turbine System
by: Soedibyo Soedibyo
Published: (2018-02-01)