Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method

Accelerated Bridge Construction (ABC) is bridge construction that uses innovative planning, design and construction methods in a safe and cost-effective manner, which reduces construction mobility and environmental impacts, and contributes to city sustainable planning and development. To deal with t...

Full description

Bibliographic Details
Main Authors: Jianmin Jia, Mohamed Ibrahim, Mohammed Hadi, Wallied Orabi, Yan Xiao
Format: Article
Language:English
Published: MDPI AG 2018-11-01
Series:Sustainability
Subjects:
Online Access:https://www.mdpi.com/2071-1050/10/11/4059
id doaj-9174b0735def4412b14cef63ab4f6581
record_format Article
spelling doaj-9174b0735def4412b14cef63ab4f65812020-11-25T01:25:57ZengMDPI AGSustainability2071-10502018-11-011011405910.3390/su10114059su10114059Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) MethodJianmin Jia0Mohamed Ibrahim1Mohammed Hadi2Wallied Orabi3Yan Xiao4School of Transportation Engineering, Shandong Jianzhu University, Jinan 250101, Shandong, ChinaDepartment of Civil and Environmental Engineering, Florida International University, 10555 W. Flagler Street, EC 3730, Miami, FL 33174, USADepartment of Civil and Environmental Engineering, Florida International University, 10555 W. Flagler Street, EC 3730, Miami, FL 33174, USADepartment of Civil and Environmental Engineering, Florida International University, 10555 W. Flagler Street, EC 3730, Miami, FL 33174, USADepartment of Civil and Environmental Engineering, Florida International University, 10555 W. Flagler Street, EC 3730, Miami, FL 33174, USAAccelerated Bridge Construction (ABC) is bridge construction that uses innovative planning, design and construction methods in a safe and cost-effective manner, which reduces construction mobility and environmental impacts, and contributes to city sustainable planning and development. To deal with the pressing need to support the decisions associated with the selection between the ABC and conventional bridge construction, this paper presents the development of a multi-criteria evaluation framework. Methods are developed and identified to estimate the construction, agency, and user costs associated with the construction methods. A novel model was developed to allow the estimation of the construction and agency costs of ABC relative to conventional construction. This paper also demonstrates the estimation of user costs, including those associated with mobility, reliability, safety, and emissions, utilizing combinations of the proposed prediction method. The paper then compares the use of the return-on-investment and Technique for Order Performance by Similarity to Ideal Solution (TOPSIS) Multi-Criteria Decision Making (MCDM) evaluation approaches in the decision to select between ABC and conventional bridge construction. The results from the employment of the two approaches to a case study demonstrate the advantage of using the TOPSIS approach, which is also applicable in the urban planning process.https://www.mdpi.com/2071-1050/10/11/4059Accelerated Bridge Constructionconstruction costroad user costreturn-on-investment analysisMulti-Criteria Decision MakingFuzzy TOPSIS
collection DOAJ
language English
format Article
sources DOAJ
author Jianmin Jia
Mohamed Ibrahim
Mohammed Hadi
Wallied Orabi
Yan Xiao
spellingShingle Jianmin Jia
Mohamed Ibrahim
Mohammed Hadi
Wallied Orabi
Yan Xiao
Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method
Sustainability
Accelerated Bridge Construction
construction cost
road user cost
return-on-investment analysis
Multi-Criteria Decision Making
Fuzzy TOPSIS
author_facet Jianmin Jia
Mohamed Ibrahim
Mohammed Hadi
Wallied Orabi
Yan Xiao
author_sort Jianmin Jia
title Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method
title_short Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method
title_full Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method
title_fullStr Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method
title_full_unstemmed Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method
title_sort multi-criteria evaluation framework in selection of accelerated bridge construction (abc) method
publisher MDPI AG
series Sustainability
issn 2071-1050
publishDate 2018-11-01
description Accelerated Bridge Construction (ABC) is bridge construction that uses innovative planning, design and construction methods in a safe and cost-effective manner, which reduces construction mobility and environmental impacts, and contributes to city sustainable planning and development. To deal with the pressing need to support the decisions associated with the selection between the ABC and conventional bridge construction, this paper presents the development of a multi-criteria evaluation framework. Methods are developed and identified to estimate the construction, agency, and user costs associated with the construction methods. A novel model was developed to allow the estimation of the construction and agency costs of ABC relative to conventional construction. This paper also demonstrates the estimation of user costs, including those associated with mobility, reliability, safety, and emissions, utilizing combinations of the proposed prediction method. The paper then compares the use of the return-on-investment and Technique for Order Performance by Similarity to Ideal Solution (TOPSIS) Multi-Criteria Decision Making (MCDM) evaluation approaches in the decision to select between ABC and conventional bridge construction. The results from the employment of the two approaches to a case study demonstrate the advantage of using the TOPSIS approach, which is also applicable in the urban planning process.
topic Accelerated Bridge Construction
construction cost
road user cost
return-on-investment analysis
Multi-Criteria Decision Making
Fuzzy TOPSIS
url https://www.mdpi.com/2071-1050/10/11/4059
work_keys_str_mv AT jianminjia multicriteriaevaluationframeworkinselectionofacceleratedbridgeconstructionabcmethod
AT mohamedibrahim multicriteriaevaluationframeworkinselectionofacceleratedbridgeconstructionabcmethod
AT mohammedhadi multicriteriaevaluationframeworkinselectionofacceleratedbridgeconstructionabcmethod
AT walliedorabi multicriteriaevaluationframeworkinselectionofacceleratedbridgeconstructionabcmethod
AT yanxiao multicriteriaevaluationframeworkinselectionofacceleratedbridgeconstructionabcmethod
_version_ 1725111580377481216