PROJECT MANAGEMENT AND RESOURCE ALLOCATION OPTIMIZATION IN CONDITIONS CHARACTERIZED BY RISK

Project management represents the transformation of a vision into reality. The vision is a future state which put into practice will help up improve the company’s performance, solve a problem or exploit an opportunity for a higher profit. Project management is a structured process through which we...

Full description

Bibliographic Details
Main Author: Andrei-Stelian ZIDARU
Format: Article
Language:English
Published: Editura Academiei Oamenilor de Știință din România 2013-05-01
Series:Annals: Series on engineering sciences (Academy of Romanian Scientists)
Subjects:
Online Access:http://aos.ro/wp-content/anale/TVol5Nr1Art.10.pdf
id doaj-90c026cf673742e480fe34fe8b2ab290
record_format Article
spelling doaj-90c026cf673742e480fe34fe8b2ab2902020-11-25T00:26:02Zeng Editura Academiei Oamenilor de Știință din România Annals: Series on engineering sciences (Academy of Romanian Scientists)2066-69502066-85702013-05-0151107114PROJECT MANAGEMENT AND RESOURCE ALLOCATION OPTIMIZATION IN CONDITIONS CHARACTERIZED BY RISKAndrei-Stelian ZIDARU0University POLITEHNICA of Bucharest, Romania Project management represents the transformation of a vision into reality. The vision is a future state which put into practice will help up improve the company’s performance, solve a problem or exploit an opportunity for a higher profit. Project management is a structured process through which we can deliver successfully this future state. Risks have a great impact on costs thus making the risk analysis and resource allocation optimization a must. There are positive risks and negative risks - some of which will be accepted as normal and usually have a low cost associated or, on the other hand, there are inevitable risks which shall have to be dealt with through contingency plans. http://aos.ro/wp-content/anale/TVol5Nr1Art.10.pdfriskproject managementplanningresourcesoptimization
collection DOAJ
language English
format Article
sources DOAJ
author Andrei-Stelian ZIDARU
spellingShingle Andrei-Stelian ZIDARU
PROJECT MANAGEMENT AND RESOURCE ALLOCATION OPTIMIZATION IN CONDITIONS CHARACTERIZED BY RISK
Annals: Series on engineering sciences (Academy of Romanian Scientists)
risk
project management
planning
resources
optimization
author_facet Andrei-Stelian ZIDARU
author_sort Andrei-Stelian ZIDARU
title PROJECT MANAGEMENT AND RESOURCE ALLOCATION OPTIMIZATION IN CONDITIONS CHARACTERIZED BY RISK
title_short PROJECT MANAGEMENT AND RESOURCE ALLOCATION OPTIMIZATION IN CONDITIONS CHARACTERIZED BY RISK
title_full PROJECT MANAGEMENT AND RESOURCE ALLOCATION OPTIMIZATION IN CONDITIONS CHARACTERIZED BY RISK
title_fullStr PROJECT MANAGEMENT AND RESOURCE ALLOCATION OPTIMIZATION IN CONDITIONS CHARACTERIZED BY RISK
title_full_unstemmed PROJECT MANAGEMENT AND RESOURCE ALLOCATION OPTIMIZATION IN CONDITIONS CHARACTERIZED BY RISK
title_sort project management and resource allocation optimization in conditions characterized by risk
publisher Editura Academiei Oamenilor de Știință din România
series Annals: Series on engineering sciences (Academy of Romanian Scientists)
issn 2066-6950
2066-8570
publishDate 2013-05-01
description Project management represents the transformation of a vision into reality. The vision is a future state which put into practice will help up improve the company’s performance, solve a problem or exploit an opportunity for a higher profit. Project management is a structured process through which we can deliver successfully this future state. Risks have a great impact on costs thus making the risk analysis and resource allocation optimization a must. There are positive risks and negative risks - some of which will be accepted as normal and usually have a low cost associated or, on the other hand, there are inevitable risks which shall have to be dealt with through contingency plans.
topic risk
project management
planning
resources
optimization
url http://aos.ro/wp-content/anale/TVol5Nr1Art.10.pdf
work_keys_str_mv AT andreistelianzidaru projectmanagementandresourceallocationoptimizationinconditionscharacterizedbyrisk
_version_ 1725346298817675264