Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity

A Project Estimator cannot claim that his/her estimated duration is better than others. They can determine the reasonable duration based on deterministic and probabilistic factors affecting the duration and then specify how to achieve it. This condition provides an overview that the activity duratio...

Full description

Bibliographic Details
Main Authors: Fachrurrazi Fachrurrazi, Abdullah Abdullah, Away Yuwaldi, Aulia Teuku Budi
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201819710004
id doaj-90466bc944404a9cae1784820be1b18e
record_format Article
spelling doaj-90466bc944404a9cae1784820be1b18e2021-04-02T09:54:05ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-011971000410.1051/matecconf/201819710004matecconf_aasec2018_10004Estimating the normal duration using normal Production Rate per Day (PRPD) of project activityFachrurrazi FachrurraziAbdullah AbdullahAway YuwaldiAulia Teuku BudiA Project Estimator cannot claim that his/her estimated duration is better than others. They can determine the reasonable duration based on deterministic and probabilistic factors affecting the duration and then specify how to achieve it. This condition provides an overview that the activity duration changeable stochastically as a result of uncertainty-factors. However, we have a presumption that the activities duration will be normally distributed based on variation of its production rate per day (PRPD). The purpose of this study are (i) estimating the normal duration of the project activities using PRPD; and (ii) conducting the hypothesis testing for the PRPD normality of the project activities in South of Aceh. Hypothesis testing toward six-activities from 50 projects in South of Aceh will be used to achieve research objectives. Result shows PRPD normally distributed with skewness value still falling inside tolerance range of -1/+1. We argue that the normal duration of activity can be estimated more quickly involving its normal PRPD. An estimator does not need to predict what the factors affecting the duration estimation, especially in the bidding/tender process. They only need the normal PRPD as a standard value, to estimate, to assess and to verify the normality level of actual duration for the purpose of project decision.https://doi.org/10.1051/matecconf/201819710004
collection DOAJ
language English
format Article
sources DOAJ
author Fachrurrazi Fachrurrazi
Abdullah Abdullah
Away Yuwaldi
Aulia Teuku Budi
spellingShingle Fachrurrazi Fachrurrazi
Abdullah Abdullah
Away Yuwaldi
Aulia Teuku Budi
Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity
MATEC Web of Conferences
author_facet Fachrurrazi Fachrurrazi
Abdullah Abdullah
Away Yuwaldi
Aulia Teuku Budi
author_sort Fachrurrazi Fachrurrazi
title Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity
title_short Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity
title_full Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity
title_fullStr Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity
title_full_unstemmed Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity
title_sort estimating the normal duration using normal production rate per day (prpd) of project activity
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2018-01-01
description A Project Estimator cannot claim that his/her estimated duration is better than others. They can determine the reasonable duration based on deterministic and probabilistic factors affecting the duration and then specify how to achieve it. This condition provides an overview that the activity duration changeable stochastically as a result of uncertainty-factors. However, we have a presumption that the activities duration will be normally distributed based on variation of its production rate per day (PRPD). The purpose of this study are (i) estimating the normal duration of the project activities using PRPD; and (ii) conducting the hypothesis testing for the PRPD normality of the project activities in South of Aceh. Hypothesis testing toward six-activities from 50 projects in South of Aceh will be used to achieve research objectives. Result shows PRPD normally distributed with skewness value still falling inside tolerance range of -1/+1. We argue that the normal duration of activity can be estimated more quickly involving its normal PRPD. An estimator does not need to predict what the factors affecting the duration estimation, especially in the bidding/tender process. They only need the normal PRPD as a standard value, to estimate, to assess and to verify the normality level of actual duration for the purpose of project decision.
url https://doi.org/10.1051/matecconf/201819710004
work_keys_str_mv AT fachrurrazifachrurrazi estimatingthenormaldurationusingnormalproductionrateperdayprpdofprojectactivity
AT abdullahabdullah estimatingthenormaldurationusingnormalproductionrateperdayprpdofprojectactivity
AT awayyuwaldi estimatingthenormaldurationusingnormalproductionrateperdayprpdofprojectactivity
AT auliateukubudi estimatingthenormaldurationusingnormalproductionrateperdayprpdofprojectactivity
_version_ 1724168447244369920