Performance Analysis of AP1000 Passive Systems during Direct Vessel Injection (DVI) Line Break
Generation II Nuclear Power Plants (NPPs) have a design weakness as shown by the Fukushima accident. Therefore, Generation III+ NPPs are developed with focus on improvements of fuel technology and thermal efficiency, standardized design, and the use of passive safety system. One type of Generation I...
Main Authors: | A.S. Ekariansyah, S. Widodo |
---|---|
Format: | Article |
Language: | English |
Published: |
Center for Development of Nuclear Informatics, National Nuclear Energy Agency (BATAN)
2016-08-01
|
Series: | Atom Indonesia |
Subjects: | |
Online Access: | http://aij.batan.go.id/index.php/aij/article/view/511 |
Similar Items
-
Latest Interpol reports on disaster victim identification and the process of implementing international DVI standards in Poland
by: Magdalena Jabłońska-Milczarek, et al.
Published: (2021-03-01) -
RESULTS OF VERA APPLICATION TO THE AP1000® PWR STARTUP
by: Franceschini F., et al.
Published: (2021-01-01) -
DISASTER VICTIM IDENTIFICATION (DVI) TRAINING FOR MEDICAL STUDENT
by: Taufik Suryadi Ismail, et al.
Published: (2020-07-01) -
Panorama del CD-I y del DVI
by: David Raitt
Published: (1990-03-01) -
Evaluation of Passive Safety Injection System Performance Under Large Break LOCA for Qinshan PWR
by: Xuesong Wang, et al.
Published: (2021-07-01)