Composite girder to fulfill the needs of 60 up to 80 m span bridge for toll road projects in Indonesia

Ministry of Public Works and Housing of Indonesia is targeting to complete the construction of 1.000 km of new toll road projects by the end of 2019. In 2015 until August 2018, 443 km new toll roads have been operated and 1.400 km are under construction. Various types of structure for elevated toll...

Full description

Bibliographic Details
Main Authors: Trisaputra Zuna Herry, Budi Astuti Zulaikha
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_06001.pdf
id doaj-8f754bd19f7d4e4b8428d3d4c7689810
record_format Article
spelling doaj-8f754bd19f7d4e4b8428d3d4c76898102021-02-02T08:20:10ZengEDP SciencesMATEC Web of Conferences2261-236X2019-01-012700600110.1051/matecconf/201927006001matecconf_concern2018_06001Composite girder to fulfill the needs of 60 up to 80 m span bridge for toll road projects in IndonesiaTrisaputra Zuna HerryBudi Astuti ZulaikhaMinistry of Public Works and Housing of Indonesia is targeting to complete the construction of 1.000 km of new toll road projects by the end of 2019. In 2015 until August 2018, 443 km new toll roads have been operated and 1.400 km are under construction. Various types of structure for elevated toll road constructions are applied to meet the geometry and safety requirements such as cast in-situ balanced cantilever, steel I-girder, and steel box are becoming type of elevated toll construction to be applied. To meet the requirements of construction methods, construction time completion, and material volume efficiency, Indonesia Toll Road Authority on behalf Ministry of Public Works and Housing gives opportunities to toll road investors to apply the new technology as the proper selection. Composite Girder technology named Sbarch is proposed for Krian Legundi Bunder Manyar toll road project to cross at SUMO Junction. Compares Sbarch among cast in situ balanced cantilever, steel I-girder and steel box, Sbarch can comply for all requirement that cannot be fulfilled by others method such as with finish grade requirement, to road geometry alignment, accessibility, workability, and steel tonnage reducing.https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_06001.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Trisaputra Zuna Herry
Budi Astuti Zulaikha
spellingShingle Trisaputra Zuna Herry
Budi Astuti Zulaikha
Composite girder to fulfill the needs of 60 up to 80 m span bridge for toll road projects in Indonesia
MATEC Web of Conferences
author_facet Trisaputra Zuna Herry
Budi Astuti Zulaikha
author_sort Trisaputra Zuna Herry
title Composite girder to fulfill the needs of 60 up to 80 m span bridge for toll road projects in Indonesia
title_short Composite girder to fulfill the needs of 60 up to 80 m span bridge for toll road projects in Indonesia
title_full Composite girder to fulfill the needs of 60 up to 80 m span bridge for toll road projects in Indonesia
title_fullStr Composite girder to fulfill the needs of 60 up to 80 m span bridge for toll road projects in Indonesia
title_full_unstemmed Composite girder to fulfill the needs of 60 up to 80 m span bridge for toll road projects in Indonesia
title_sort composite girder to fulfill the needs of 60 up to 80 m span bridge for toll road projects in indonesia
publisher EDP Sciences
series MATEC Web of Conferences
issn 2261-236X
publishDate 2019-01-01
description Ministry of Public Works and Housing of Indonesia is targeting to complete the construction of 1.000 km of new toll road projects by the end of 2019. In 2015 until August 2018, 443 km new toll roads have been operated and 1.400 km are under construction. Various types of structure for elevated toll road constructions are applied to meet the geometry and safety requirements such as cast in-situ balanced cantilever, steel I-girder, and steel box are becoming type of elevated toll construction to be applied. To meet the requirements of construction methods, construction time completion, and material volume efficiency, Indonesia Toll Road Authority on behalf Ministry of Public Works and Housing gives opportunities to toll road investors to apply the new technology as the proper selection. Composite Girder technology named Sbarch is proposed for Krian Legundi Bunder Manyar toll road project to cross at SUMO Junction. Compares Sbarch among cast in situ balanced cantilever, steel I-girder and steel box, Sbarch can comply for all requirement that cannot be fulfilled by others method such as with finish grade requirement, to road geometry alignment, accessibility, workability, and steel tonnage reducing.
url https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_06001.pdf
work_keys_str_mv AT trisaputrazunaherry compositegirdertofulfilltheneedsof60upto80mspanbridgefortollroadprojectsinindonesia
AT budiastutizulaikha compositegirdertofulfilltheneedsof60upto80mspanbridgefortollroadprojectsinindonesia
_version_ 1724297382859898880