Mixed-Model Assembly Line Balancing in The Process of Assembling Trimming Area to Minimize Workstation Using RPW-MVM Method

The development of an industry that continues to move forward coupled with global competition and openness demands that the company continues to evolve and always make improvements in improving the performance of its production process. XYZ Corp is an automotive company based in Germany that produce...

Full description

Bibliographic Details
Main Authors: Ali Yusuf Muhamad, Diah Damayanti Dida, Dwi Astuti Murni
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:SHS Web of Conferences
Online Access:https://www.shs-conferences.org/articles/shsconf/pdf/2020/14/shsconf_icore2020_01028.pdf
id doaj-8f4a5f4b6e944989a6e9572f1cdcf6ec
record_format Article
spelling doaj-8f4a5f4b6e944989a6e9572f1cdcf6ec2021-04-02T19:04:19ZengEDP SciencesSHS Web of Conferences2261-24242020-01-01860102810.1051/shsconf/20208601028shsconf_icore2020_01028Mixed-Model Assembly Line Balancing in The Process of Assembling Trimming Area to Minimize Workstation Using RPW-MVM MethodAli Yusuf MuhamadDiah Damayanti DidaDwi Astuti MurniThe development of an industry that continues to move forward coupled with global competition and openness demands that the company continues to evolve and always make improvements in improving the performance of its production process. XYZ Corp is an automotive company based in Germany that produces premium cars, the car assembly process groove at XYZ Corp is a trimming line, mechanical line and finishing line, XYZ Corp produces A-model, B-model and C-model cars. At this time XYZ Corp not achieving the production target due to the car assembly cycle time on the trimming Line 1 area exceeds the specified takt time. Assembly line balancing is required in the trimming area using Mixed-Model Assembly Line Balancing Problem (MALBP) approach to minimize the number of workstation, in the Trimming area assembly line balancing study using the Ranked Positional Weighted with Moving Target (RPW-MVM) method. Alocation constraint should be added due to machine restrictions that cannot be moved. After assembly line balancing, there was a decrease in the number of workstations to 14 workstations with a line efficiency of 86% and balancing efficiency of 97%.https://www.shs-conferences.org/articles/shsconf/pdf/2020/14/shsconf_icore2020_01028.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Ali Yusuf Muhamad
Diah Damayanti Dida
Dwi Astuti Murni
spellingShingle Ali Yusuf Muhamad
Diah Damayanti Dida
Dwi Astuti Murni
Mixed-Model Assembly Line Balancing in The Process of Assembling Trimming Area to Minimize Workstation Using RPW-MVM Method
SHS Web of Conferences
author_facet Ali Yusuf Muhamad
Diah Damayanti Dida
Dwi Astuti Murni
author_sort Ali Yusuf Muhamad
title Mixed-Model Assembly Line Balancing in The Process of Assembling Trimming Area to Minimize Workstation Using RPW-MVM Method
title_short Mixed-Model Assembly Line Balancing in The Process of Assembling Trimming Area to Minimize Workstation Using RPW-MVM Method
title_full Mixed-Model Assembly Line Balancing in The Process of Assembling Trimming Area to Minimize Workstation Using RPW-MVM Method
title_fullStr Mixed-Model Assembly Line Balancing in The Process of Assembling Trimming Area to Minimize Workstation Using RPW-MVM Method
title_full_unstemmed Mixed-Model Assembly Line Balancing in The Process of Assembling Trimming Area to Minimize Workstation Using RPW-MVM Method
title_sort mixed-model assembly line balancing in the process of assembling trimming area to minimize workstation using rpw-mvm method
publisher EDP Sciences
series SHS Web of Conferences
issn 2261-2424
publishDate 2020-01-01
description The development of an industry that continues to move forward coupled with global competition and openness demands that the company continues to evolve and always make improvements in improving the performance of its production process. XYZ Corp is an automotive company based in Germany that produces premium cars, the car assembly process groove at XYZ Corp is a trimming line, mechanical line and finishing line, XYZ Corp produces A-model, B-model and C-model cars. At this time XYZ Corp not achieving the production target due to the car assembly cycle time on the trimming Line 1 area exceeds the specified takt time. Assembly line balancing is required in the trimming area using Mixed-Model Assembly Line Balancing Problem (MALBP) approach to minimize the number of workstation, in the Trimming area assembly line balancing study using the Ranked Positional Weighted with Moving Target (RPW-MVM) method. Alocation constraint should be added due to machine restrictions that cannot be moved. After assembly line balancing, there was a decrease in the number of workstations to 14 workstations with a line efficiency of 86% and balancing efficiency of 97%.
url https://www.shs-conferences.org/articles/shsconf/pdf/2020/14/shsconf_icore2020_01028.pdf
work_keys_str_mv AT aliyusufmuhamad mixedmodelassemblylinebalancingintheprocessofassemblingtrimmingareatominimizeworkstationusingrpwmvmmethod
AT diahdamayantidida mixedmodelassemblylinebalancingintheprocessofassemblingtrimmingareatominimizeworkstationusingrpwmvmmethod
AT dwiastutimurni mixedmodelassemblylinebalancingintheprocessofassemblingtrimmingareatominimizeworkstationusingrpwmvmmethod
_version_ 1721549660697395200