An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown

In real supply chain environments, the discontinuous multidelivery policy is often used when finished products need to be transported to retailers or customers outside the production units. To address this real-life production-shipment situation, this study extends recent work using an economic prod...

Full description

Bibliographic Details
Main Authors: Singa Wang Chiu, Hong-Dar Lin, Ming-Syuan Song, Hsin-Mei Chen, Yuan-Shyi P. Chiu
Format: Article
Language:English
Published: Hindawi Limited 2015-01-01
Series:The Scientific World Journal
Online Access:http://dx.doi.org/10.1155/2015/621978
id doaj-8f1f1dd335f140aaa02fe00c469ed515
record_format Article
spelling doaj-8f1f1dd335f140aaa02fe00c469ed5152020-11-25T01:57:47ZengHindawi LimitedThe Scientific World Journal2356-61401537-744X2015-01-01201510.1155/2015/621978621978An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random BreakdownSinga Wang Chiu0Hong-Dar Lin1Ming-Syuan Song2Hsin-Mei Chen3Yuan-Shyi P. Chiu4Department of Business Administration, Chaoyang University of Technology, Taichung 413, TaiwanDepartment of Industrial Engineering & Management, Chaoyang University of Technology, Wufong District, Taichung 413, TaiwanDepartment of Industrial Engineering & Management, Chaoyang University of Technology, Wufong District, Taichung 413, TaiwanDepartment of Industrial Engineering & Management, Chaoyang University of Technology, Wufong District, Taichung 413, TaiwanDepartment of Industrial Engineering & Management, Chaoyang University of Technology, Wufong District, Taichung 413, TaiwanIn real supply chain environments, the discontinuous multidelivery policy is often used when finished products need to be transported to retailers or customers outside the production units. To address this real-life production-shipment situation, this study extends recent work using an economic production quantity- (EPQ-) based inventory model with a continuous inventory issuing policy, defective items, and machine breakdown by incorporating a multiple delivery policy into the model to replace the continuous policy and investigates the effect on the optimal run time decision for this specific EPQ model. Next, we further expand the scope of the problem to combine the retailer’s stock holding cost into our study. This enhanced EPQ-based model can be used to reflect the situation found in contemporary manufacturing firms in which finished products are delivered to the producer’s own retail stores and stocked there for sale. A second model is developed and studied. With the help of mathematical modeling and optimization techniques, the optimal run times that minimize the expected total system costs comprising costs incurred in production units, transportation, and retail stores are derived, for both models. Numerical examples are provided to demonstrate the applicability of our research results.http://dx.doi.org/10.1155/2015/621978
collection DOAJ
language English
format Article
sources DOAJ
author Singa Wang Chiu
Hong-Dar Lin
Ming-Syuan Song
Hsin-Mei Chen
Yuan-Shyi P. Chiu
spellingShingle Singa Wang Chiu
Hong-Dar Lin
Ming-Syuan Song
Hsin-Mei Chen
Yuan-Shyi P. Chiu
An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
The Scientific World Journal
author_facet Singa Wang Chiu
Hong-Dar Lin
Ming-Syuan Song
Hsin-Mei Chen
Yuan-Shyi P. Chiu
author_sort Singa Wang Chiu
title An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_short An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_full An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_fullStr An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_full_unstemmed An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_sort extended epq-based problem with a discontinuous delivery policy, scrap rate, and random breakdown
publisher Hindawi Limited
series The Scientific World Journal
issn 2356-6140
1537-744X
publishDate 2015-01-01
description In real supply chain environments, the discontinuous multidelivery policy is often used when finished products need to be transported to retailers or customers outside the production units. To address this real-life production-shipment situation, this study extends recent work using an economic production quantity- (EPQ-) based inventory model with a continuous inventory issuing policy, defective items, and machine breakdown by incorporating a multiple delivery policy into the model to replace the continuous policy and investigates the effect on the optimal run time decision for this specific EPQ model. Next, we further expand the scope of the problem to combine the retailer’s stock holding cost into our study. This enhanced EPQ-based model can be used to reflect the situation found in contemporary manufacturing firms in which finished products are delivered to the producer’s own retail stores and stocked there for sale. A second model is developed and studied. With the help of mathematical modeling and optimization techniques, the optimal run times that minimize the expected total system costs comprising costs incurred in production units, transportation, and retail stores are derived, for both models. Numerical examples are provided to demonstrate the applicability of our research results.
url http://dx.doi.org/10.1155/2015/621978
work_keys_str_mv AT singawangchiu anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT hongdarlin anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT mingsyuansong anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT hsinmeichen anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT yuanshyipchiu anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT singawangchiu extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT hongdarlin extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT mingsyuansong extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT hsinmeichen extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT yuanshyipchiu extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
_version_ 1724972552646819840