A new approach for modelling variability in residential construction projects
<p>The construction industry is plagued by long cycle times caused by variability in the supply chain. Variations or undesirable situations are the result of factors such as non-standard practices, work site accidents, inclement weather conditions and faults in design. This paper uses a new ap...
Main Authors: | Mehrdad Arashpour, Ron Wakefield, Nick Blismas, EWM lee |
---|---|
Format: | Article |
Language: | English |
Published: |
UTS ePRESS
2013-06-01
|
Series: | Australasian Journal of Construction Economics and Building |
Subjects: | |
Online Access: | https://epress.lib.uts.edu.au/journals/index.php/AJCEB/article/view/3120 |
Similar Items
-
A new approach for modelling variability in residential construction projects
by: Mehrdad Arashpour, et al.
Published: (2013-06-01) -
Causes of delay in residential construction projects in Cambodia
by: Serdar Durdyev, et al.
Published: (2017-01-01) -
Analysing the Relationship between New Housing Supply and Residential Construction Costs with Regional Heterogeneities
by: Junxiao Liu, et al.
Published: (2011-09-01) -
Analysing the Relationship between New Housing Supply and Residential Construction Costs with Regional Heterogeneities
by: Junxiao Liu, et al.
Published: (2011-09-01) -
Analysis of Turkish residential construction market dynamics for the periods of 2010–2015, 2015–2019, and projections for the future
by: Mehmet Emre Çamlibel, et al.
Published: (2020-09-01)