A Study on the Black Start Process of a real Distribution Network with CHP plants and BESS
The power system experiences many changes, which are leading to new challenges. The electric energy will no longer be generated only by large power plants, but rather by numerous decentralized energy resources that are primarily installed in distribution grids. In particular, power system restoratio...
Main Authors: | Strunck Christoph, Albrecht Marvin, Meindl Gerhard, Rehtanz Christian |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | EPJ Web of Conferences |
Online Access: | https://www.epj-conferences.org/articles/epjconf/pdf/2019/22/epjconf_freps18_01015.pdf |
Similar Items
-
Definition of Key Indicators to Identify Optimal Distribution Grid Restoration Strategies
by: Strunck Christoph, et al.
Published: (2020-01-01) -
Optimal Scheduling of Hydro–PV–Wind Hybrid System Considering CHP and BESS Coordination
by: Shengmin Tan, et al.
Published: (2019-03-01) -
An Integrated Transmission Expansion and Sectionalizing-Based Black Start Allocation of BESS Planning Strategy for Enhanced Power Grid Resilience
by: Fang Yao, et al.
Published: (2020-01-01) -
Spatial distribution of pollutants in the area of the former CHP plant
by: Cichowicz Robert
Published: (2018-01-01) -
Power Quality Improvement of Distribution Network Using BESS and Capacitor Bank
by: F. R. Islam, et al.
Published: (2021-01-01)