Development of the rational bottomhole assemblies of the directed well drilling
The problem of development of gas hydrate deposits is complicated by a range of problems connected with the adaptation of traditional methods and procedures to develop the mentioned type of raw materials. Construction methods of the directed well deserve high attention since they are the most effici...
Main Authors: | Ihnatov Andrii, Koroviaka Yevhenii, Rastsvietaiev Valerii, Tokar Larysa |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/06/e3sconf_ght2020_01016.pdf |
Similar Items
-
Substantiating rational parameters of a method for shrinkage ore stoping while developing thin-vein steeply inclined deposits
by: Shyrin Leonid, et al.
Published: (2018-01-01) -
Improved Bottomhole Pressure Control for Underbalanced Drilling Operations
by: Perez-Tellez, Carlos
Published: (2003) -
Improving operation efficiency of transportation vehicles equipped with a flexible tractive element under conditions of mining enterprises
by: Lubenets Mykola, et al.
Published: (2019-01-01) -
Evaluation of Kalman filters for estimation of the annular bottomhole pressure during drilling
by: Rognmo, Thomas
Published: (2008) -
Estimation of Bottomhole Pressure for Managed Pressure Drilling : Comparison of Nonlinear Estimators
by: Løvik, Pål Skønberg
Published: (2011)