Studi Manajemen Energi di Rumah Sakit Prima Medika Denpasar

Abstract—Prima Medika Hospital is a nationally accredited hospital with the highest category or Plenary in 2016. With the highest patient visit rate of 59,289 people in 2017 and an average occupancy rate of 79.89% is entered into the ideal category with electricity consumption of 2,299,077 kWh / yea...

Full description

Bibliographic Details
Main Authors: Cecep Yudhie Rachmat, I Nyoman Satya Kumara, I.A.D Giriantari
Format: Article
Language:English
Published: Universitas Udayana 2019-05-01
Series:Majalah Ilmiah Teknologi Elektro
Online Access:https://ojs.unud.ac.id/index.php/JTE/article/view/42516
id doaj-8e5ca35a12a64d5bb9d978b45d8e4a13
record_format Article
spelling doaj-8e5ca35a12a64d5bb9d978b45d8e4a132020-11-25T03:17:50ZengUniversitas UdayanaMajalah Ilmiah Teknologi Elektro1693-29512503-23722019-05-01181233410.24843/MITE.2019.v18i01.P0442516Studi Manajemen Energi di Rumah Sakit Prima Medika DenpasarCecep Yudhie RachmatI Nyoman Satya KumaraI.A.D GiriantariAbstract—Prima Medika Hospital is a nationally accredited hospital with the highest category or Plenary in 2016. With the highest patient visit rate of 59,289 people in 2017 and an average occupancy rate of 79.89% is entered into the ideal category with electricity consumption of 2,299,077 kWh / year. Electricity expenses come from 5 equipment groups, namely: lighting equipment group 20.08%, equipment for air arrangement system 56.12%, medical equipment 8.92%, office equipment 5.30% and utilities utilities 9.57%. From the initial energy audit calculation, the Energy Consumption Intensity index is 344.23 kWh / m² / year and this is included in the Intensive Energy category or shows wasteful energy use. Energy conservation efforts will be carried out on all equipment groups, especially to the equipment of the air structuring system which is the biggest energy absorber starting from the assumption of equipment operating hour patterns and then searching for energy-saving potentials starting from the lighting equipment group in the form of lamp replacement with Light type Emitting Diode, from the office equipment group with the control of operating hours of Dispenser equipment and from the group of air structuring equipment with the replacement of standard AC technology into AC inverters, the total potential of electricity energy savings was 613,813.2 kwh / year or 26.70% so if the proposed Energy Saving Opportunity can be implemented then the final value can be reduced to 252.33 kWh / m² / Year or included in the Energy Standard category or already efficienthttps://ojs.unud.ac.id/index.php/JTE/article/view/42516
collection DOAJ
language English
format Article
sources DOAJ
author Cecep Yudhie Rachmat
I Nyoman Satya Kumara
I.A.D Giriantari
spellingShingle Cecep Yudhie Rachmat
I Nyoman Satya Kumara
I.A.D Giriantari
Studi Manajemen Energi di Rumah Sakit Prima Medika Denpasar
Majalah Ilmiah Teknologi Elektro
author_facet Cecep Yudhie Rachmat
I Nyoman Satya Kumara
I.A.D Giriantari
author_sort Cecep Yudhie Rachmat
title Studi Manajemen Energi di Rumah Sakit Prima Medika Denpasar
title_short Studi Manajemen Energi di Rumah Sakit Prima Medika Denpasar
title_full Studi Manajemen Energi di Rumah Sakit Prima Medika Denpasar
title_fullStr Studi Manajemen Energi di Rumah Sakit Prima Medika Denpasar
title_full_unstemmed Studi Manajemen Energi di Rumah Sakit Prima Medika Denpasar
title_sort studi manajemen energi di rumah sakit prima medika denpasar
publisher Universitas Udayana
series Majalah Ilmiah Teknologi Elektro
issn 1693-2951
2503-2372
publishDate 2019-05-01
description Abstract—Prima Medika Hospital is a nationally accredited hospital with the highest category or Plenary in 2016. With the highest patient visit rate of 59,289 people in 2017 and an average occupancy rate of 79.89% is entered into the ideal category with electricity consumption of 2,299,077 kWh / year. Electricity expenses come from 5 equipment groups, namely: lighting equipment group 20.08%, equipment for air arrangement system 56.12%, medical equipment 8.92%, office equipment 5.30% and utilities utilities 9.57%. From the initial energy audit calculation, the Energy Consumption Intensity index is 344.23 kWh / m² / year and this is included in the Intensive Energy category or shows wasteful energy use. Energy conservation efforts will be carried out on all equipment groups, especially to the equipment of the air structuring system which is the biggest energy absorber starting from the assumption of equipment operating hour patterns and then searching for energy-saving potentials starting from the lighting equipment group in the form of lamp replacement with Light type Emitting Diode, from the office equipment group with the control of operating hours of Dispenser equipment and from the group of air structuring equipment with the replacement of standard AC technology into AC inverters, the total potential of electricity energy savings was 613,813.2 kwh / year or 26.70% so if the proposed Energy Saving Opportunity can be implemented then the final value can be reduced to 252.33 kWh / m² / Year or included in the Energy Standard category or already efficient
url https://ojs.unud.ac.id/index.php/JTE/article/view/42516
work_keys_str_mv AT cecepyudhierachmat studimanajemenenergidirumahsakitprimamedikadenpasar
AT inyomansatyakumara studimanajemenenergidirumahsakitprimamedikadenpasar
AT iadgiriantari studimanajemenenergidirumahsakitprimamedikadenpasar
_version_ 1724629703547944960