The Single-Vendor Multibuyer Integrated Production-Delivery Model with Production Capacity under Stochastic Lead Time Demand
In this paper, we consider an integrated production-delivery model in which a vendor supplies the same product to multiple buyers. Unlike existing study, in this proposed model, we assume that the sum of all buyers’ demand rates is larger than the vendor’s production rate under normal work, but less...
Main Author: | Xuefang Sun |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2020-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/2309073 |
Similar Items
-
Vendor Managed Inventory of a Single-vendor Multiple-retailer Single-warehouse Supply Chain under Stochastic Demands
by: Tahereh Poorbagheri, et al.
Published: (2014-11-01) -
Vendor Managed Inventory of a Single-vendor Multiple-retailer Single-warehouse Supply Chain under Stochastic Demands
by: Tahereh Poorbagheri, et al.
Published: (2014-11-01) -
Integrated Supply Chain for a Single Vendor and Multiple Buyers and Products with Crashing Lead Time
by: Kinley Aritonang, et al.
Published: (2020-07-01) -
Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time
by: Renqian Zhang, et al.
Published: (2018-01-01) -
Stochastic integrated vendor–buyer model with unstable lead time and setup cost
by: Chandra K. Jaggi, et al.
Published: (2011-01-01)