Issues of Improving Control and Increasing Efficiency of Production Blocks at an ISL Uranium Mine
The tasks of continuous optimizing production, looking for ways of increasing performance, cutting mining costs and expanding mineral resource base of a mining enterprise are becoming more relevant than ever in conditions of the current negative trends at the world market of uranium resources. Incre...
Main Author: | D. R. Podrezov |
---|---|
Format: | Article |
Language: | English |
Published: |
National University of Science and Technology MISiS
2020-06-01
|
Series: | Горные науки и технологии |
Subjects: | |
Online Access: | https://mst.misis.ru/jour/article/view/229 |
Similar Items
-
Flow Microbalance Simulation of Pumping and Injection Unit in In Situ Leaching Uranium Mining Area
by: Chong Zhang, et al.
Published: (2021-07-01) -
Methods for identifying system tasks of strategic management and improving efficiency of exploration enterprise
by: D. N. Moldashi
Published: (2020-09-01) -
Effect of peroxodisulfate on uranium leaching with ammonium bicarbonate
by: Nurbek Nurpeisov, et al.
Published: (2013-05-01) -
RADIONUCLIDES DISTRIBUTION NEAR FORMER URANIUM MINING
by: D. A. Zaredinov, et al.
Published: (2017-01-01) -
Numerical and theoretical modelling of uranium carbonate leaching
by: Kamati, Messag Kamati
Published: (2014)