Scheduling for Indonesia’s Aircraft Wing Structure Design Project with Critical Path Method and Resource-Constrained Project Scheduling
As an archipelagic country, Indonesia has high needs for its aviation development. About 270 million people are predicted to fly from and within Indonesia in 2034, which is three times larger than current market conditions. Due to the complexity of aircraft development projects, management of a well...
Main Authors: | Hidayat Melissa Putri, Dachyar M., Farizal |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201824803010 |
Similar Items
-
Scheduling of Empennage Structure Design Project of Indonesia’s Aircraft with Critical Path Method (CPM)
by: Wulandari Arin, et al.
Published: (2018-01-01) -
Scheduling of Aircraft Design Project: A Comparison of Critical Path Method, Design Structure Matrix and Genetic Algorithm Approaches
by: Amalia Ariani, et al.
Published: (2018-01-01) -
Generalized Resource-Constrained Critical Path Method to Improve Sustainability in Construction Project Scheduling
by: Kyunghwan Kim
Published: (2020-10-01) -
The Resource-Constrained Project Scheduling Problems with Resource Allocation and Scheduling
by: Shou-Chih Chu, et al. -
Resource Constrained Project Scheduling with Stochastic Resources
by: Furkan Uysal, et al.
Published: (2018-03-01)