Scheduling for Indonesia’s Aircraft Wing Structure Design Project with Critical Path Method and Resource-Constrained Project Scheduling

As an archipelagic country, Indonesia has high needs for its aviation development. About 270 million people are predicted to fly from and within Indonesia in 2034, which is three times larger than current market conditions. Due to the complexity of aircraft development projects, management of a well...

Full description

Bibliographic Details
Main Authors: Hidayat Melissa Putri, Dachyar M., Farizal
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201824803010
Description
Summary:As an archipelagic country, Indonesia has high needs for its aviation development. About 270 million people are predicted to fly from and within Indonesia in 2034, which is three times larger than current market conditions. Due to the complexity of aircraft development projects, management of a well-designed Indonesian aircraft design project needs to be implemented. This research aims to analyze the scheduling of aircraft wing structure design project made in Indonesia. Critical Path Method (CPM) and Resource-Constrained Project Scheduling (RCPS) are used to get better scheduling with a shorter duration to complete the project. Results from resource allocation using RCPS can yield a shorter project duration (730 working days) compared to the company’s normal resource allocation (950 working days).
ISSN:2261-236X