A framework for database optimization and workload control

In the planning phase of the project, the project manager is responsible for the activities of a greater responsibility is to make estimates and collect measurements of software as a way to control the development process, in addition of assist in making organizational decisions. In the context of M...

Full description

Bibliographic Details
Main Authors: ANDRADE, T. C., SOUZA, J. T.
Format: Article
Language:English
Published: Faculdade Salesiana Maria Auxiliadora 2010-06-01
Series:Sistemas de Informação
Subjects:
Online Access:http://www.fsma.edu.br/si/edicao5/FSMA_SI_2010_1_Estudantil_3.pdf
id doaj-8a5a9a052242497db1b27105017f3dd7
record_format Article
spelling doaj-8a5a9a052242497db1b27105017f3dd72020-11-25T01:21:22ZengFaculdade Salesiana Maria AuxiliadoraSistemas de Informação 1983-56042010-06-0152230A framework for database optimization and workload controlANDRADE, T. C.SOUZA, J. T.In the planning phase of the project, the project manager is responsible for the activities of a greater responsibility is to make estimates and collect measurements of software as a way to control the development process, in addition of assist in making organizational decisions. In the context of Micro and Small Enterprises (MSEs), various restrictions typical of companies of this size make the process of estimating and measuring yet more complex. Thus, this paper proposes a simplified measurement process based on best practices of measurement and previously documented as patterns process using the PSM to assist MPEs in all steps relating to this important process.http://www.fsma.edu.br/si/edicao5/FSMA_SI_2010_1_Estudantil_3.pdfprocesspatternmeasurement and estimate
collection DOAJ
language English
format Article
sources DOAJ
author ANDRADE, T. C.
SOUZA, J. T.
spellingShingle ANDRADE, T. C.
SOUZA, J. T.
A framework for database optimization and workload control
Sistemas de Informação
process
pattern
measurement and estimate
author_facet ANDRADE, T. C.
SOUZA, J. T.
author_sort ANDRADE, T. C.
title A framework for database optimization and workload control
title_short A framework for database optimization and workload control
title_full A framework for database optimization and workload control
title_fullStr A framework for database optimization and workload control
title_full_unstemmed A framework for database optimization and workload control
title_sort framework for database optimization and workload control
publisher Faculdade Salesiana Maria Auxiliadora
series Sistemas de Informação
issn 1983-5604
publishDate 2010-06-01
description In the planning phase of the project, the project manager is responsible for the activities of a greater responsibility is to make estimates and collect measurements of software as a way to control the development process, in addition of assist in making organizational decisions. In the context of Micro and Small Enterprises (MSEs), various restrictions typical of companies of this size make the process of estimating and measuring yet more complex. Thus, this paper proposes a simplified measurement process based on best practices of measurement and previously documented as patterns process using the PSM to assist MPEs in all steps relating to this important process.
topic process
pattern
measurement and estimate
url http://www.fsma.edu.br/si/edicao5/FSMA_SI_2010_1_Estudantil_3.pdf
work_keys_str_mv AT andradetc aframeworkfordatabaseoptimizationandworkloadcontrol
AT souzajt aframeworkfordatabaseoptimizationandworkloadcontrol
AT andradetc frameworkfordatabaseoptimizationandworkloadcontrol
AT souzajt frameworkfordatabaseoptimizationandworkloadcontrol
_version_ 1725130637987282944