Assessment of Power Generation Alternatives Through a Fuzzy Multiobjective Mixed Integer Long-Term Planning Model: Case Study of Non-Interconnected Areas of Colombia

This paper presents a fuzzy multiobjective mixed-integer linear programming (FMOMILP) model for the optimal long-term energy planning of a power generation system for the case study of non-interconnected areas of Colombia. The proposed model determines: the optimal planning of power generation, sele...

Full description

Bibliographic Details
Main Authors: A.M. Rosso Cerón, V. Kafarov, G. Latorre, Y.A. Herrera
Format: Article
Language:English
Published: AIDIC Servizi S.r.l. 2016-08-01
Series:Chemical Engineering Transactions
Online Access:https://www.cetjournal.it/index.php/cet/article/view/3660
id doaj-8a2c0adfc8414fa2b3b346be920d9a67
record_format Article
spelling doaj-8a2c0adfc8414fa2b3b346be920d9a672021-02-19T21:06:50ZengAIDIC Servizi S.r.l.Chemical Engineering Transactions2283-92162016-08-015210.3303/CET1652014Assessment of Power Generation Alternatives Through a Fuzzy Multiobjective Mixed Integer Long-Term Planning Model: Case Study of Non-Interconnected Areas of ColombiaA.M. Rosso CerónV. KafarovG. LatorreY.A. HerreraThis paper presents a fuzzy multiobjective mixed-integer linear programming (FMOMILP) model for the optimal long-term energy planning of a power generation system for the case study of non-interconnected areas of Colombia. The proposed model determines: the optimal planning of power generation, selecting between solar photovoltaic, biomass gasification, wind turbines, small hydro, grid extension, and diesel engines alternatives; the type of fuels; and the plant locations so as to meet the expected electricity demand, while satisfying the fuzzy objectives concerns: the minimization of the total power system cost and CO2 emissions and take into consideration design, operational, and efficiency constraints. In order to capture more accurately the spatial and technical characteristics of the problem, the underlying geographical area is divided into a number of individual sub-zones. Two real case study concerning San Andres and La Macarena energy planning problem demonstrates the applicability of the proposed approach. Finally, in the case of San Andres Island, the results indicate that the environmental objective favours the use of solar photovoltaic and wind turbines systems, while economic objective favours to continue using diesel plants. On the other hand, in the case of La Macarena, the environmental objective favours the use of small hydro, solar PV and the transmission, while the economic favours the biomass gasification.https://www.cetjournal.it/index.php/cet/article/view/3660
collection DOAJ
language English
format Article
sources DOAJ
author A.M. Rosso Cerón
V. Kafarov
G. Latorre
Y.A. Herrera
spellingShingle A.M. Rosso Cerón
V. Kafarov
G. Latorre
Y.A. Herrera
Assessment of Power Generation Alternatives Through a Fuzzy Multiobjective Mixed Integer Long-Term Planning Model: Case Study of Non-Interconnected Areas of Colombia
Chemical Engineering Transactions
author_facet A.M. Rosso Cerón
V. Kafarov
G. Latorre
Y.A. Herrera
author_sort A.M. Rosso Cerón
title Assessment of Power Generation Alternatives Through a Fuzzy Multiobjective Mixed Integer Long-Term Planning Model: Case Study of Non-Interconnected Areas of Colombia
title_short Assessment of Power Generation Alternatives Through a Fuzzy Multiobjective Mixed Integer Long-Term Planning Model: Case Study of Non-Interconnected Areas of Colombia
title_full Assessment of Power Generation Alternatives Through a Fuzzy Multiobjective Mixed Integer Long-Term Planning Model: Case Study of Non-Interconnected Areas of Colombia
title_fullStr Assessment of Power Generation Alternatives Through a Fuzzy Multiobjective Mixed Integer Long-Term Planning Model: Case Study of Non-Interconnected Areas of Colombia
title_full_unstemmed Assessment of Power Generation Alternatives Through a Fuzzy Multiobjective Mixed Integer Long-Term Planning Model: Case Study of Non-Interconnected Areas of Colombia
title_sort assessment of power generation alternatives through a fuzzy multiobjective mixed integer long-term planning model: case study of non-interconnected areas of colombia
publisher AIDIC Servizi S.r.l.
series Chemical Engineering Transactions
issn 2283-9216
publishDate 2016-08-01
description This paper presents a fuzzy multiobjective mixed-integer linear programming (FMOMILP) model for the optimal long-term energy planning of a power generation system for the case study of non-interconnected areas of Colombia. The proposed model determines: the optimal planning of power generation, selecting between solar photovoltaic, biomass gasification, wind turbines, small hydro, grid extension, and diesel engines alternatives; the type of fuels; and the plant locations so as to meet the expected electricity demand, while satisfying the fuzzy objectives concerns: the minimization of the total power system cost and CO2 emissions and take into consideration design, operational, and efficiency constraints. In order to capture more accurately the spatial and technical characteristics of the problem, the underlying geographical area is divided into a number of individual sub-zones. Two real case study concerning San Andres and La Macarena energy planning problem demonstrates the applicability of the proposed approach. Finally, in the case of San Andres Island, the results indicate that the environmental objective favours the use of solar photovoltaic and wind turbines systems, while economic objective favours to continue using diesel plants. On the other hand, in the case of La Macarena, the environmental objective favours the use of small hydro, solar PV and the transmission, while the economic favours the biomass gasification.
url https://www.cetjournal.it/index.php/cet/article/view/3660
work_keys_str_mv AT amrossoceron assessmentofpowergenerationalternativesthroughafuzzymultiobjectivemixedintegerlongtermplanningmodelcasestudyofnoninterconnectedareasofcolombia
AT vkafarov assessmentofpowergenerationalternativesthroughafuzzymultiobjectivemixedintegerlongtermplanningmodelcasestudyofnoninterconnectedareasofcolombia
AT glatorre assessmentofpowergenerationalternativesthroughafuzzymultiobjectivemixedintegerlongtermplanningmodelcasestudyofnoninterconnectedareasofcolombia
AT yaherrera assessmentofpowergenerationalternativesthroughafuzzymultiobjectivemixedintegerlongtermplanningmodelcasestudyofnoninterconnectedareasofcolombia
_version_ 1724260448076824576