Research on Risk Management of Gongbei Tunnel Engineering Excavation Team
Gongbei tunnel is the key project of Hong kong-Zhuhai-macao bridge Zhuhai connecting line. The tunnel adopts frozen Curve pipe curtain digging method. In order to ensure the safety of Gongbei tunnel engineering, the rsik management of tunnel excavation team has studied. It has studied on the relevan...
Main Author: | Guo Dongchen |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201820601015 |
Similar Items
-
Experimental Investigation on Mechanical Characteristics of Waterproof System for Near-Sea Tunnel: A Case Study of the Gongbei Tunnel
by: Zhenliang Zhou, et al.
Published: (2020-09-01) -
Freezing Temperature Field of FSPR under Different Pipe Configurations: A Case Study in Gongbei Tunnel, China
by: Yin Duan, et al.
Published: (2021-01-01) -
Analysis of Ground Movement during Large-Scale Pipe Roof Installation and Artificial Ground Freezing of Gongbei Tunnel
by: Xiao-qi Zhou, et al.
Published: (2021-01-01) -
Discussion on the Waterproof and Drainage System of the Coastal Tunnel and Analysis of Water Pressure Law outside Lining: A Case Study of the Gongbei Tunnel
by: Jinpeng Zhao, et al.
Published: (2021-01-01) -
In Situ Test Study on Freezing Scheme of Freeze-Sealing Pipe Roof Applied to the Gongbei Tunnel in the Hong Kong-Zhuhai-Macau Bridge
by: Xiangdong Hu, et al.
Published: (2016-12-01)