Determination of the height of destressed zone above the mined panel: An ANN model
The paper describes an artificial neural network (ANN) model to predict the height of destressed zone (HDZ) which is taken as equivalent to the combined height of caved and fractured zones above the mined panel in longwall mining. For this, the suitable datasets have been collected from the literatu...
Main Authors: | Mohammad Rezaei, Mohammad Farouq Hossaini, Abbas Majdi, Iraj Najmoddini |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Tehran
2017-06-01
|
Series: | International Journal of Mining and Geo-Engineering |
Subjects: | |
Online Access: | http://ijmge.ut.ac.ir/article_62147_902ae1281ca1d2271d0e5d6f13b8a0f4.pdf |
Similar Items
-
Development of a time-dependent energy model to calculate the mining-induced stress over gates and pillars
by: Mohammad Rezaei, et al.
Published: (2015-06-01) -
Segmented enlarged‐diameter borehole destressing mechanism and its influence on anchorage support system
by: Jinpeng Yao, et al.
Published: (2020-08-01) -
Geomechanical effects of stress shadow created by large-scale destress blasting
by: Isaac Vennes, et al.
Published: (2017-12-01) -
Protecting miners from coal bursts during development above historic mine workings in Harlan County, KY
by: Christopher Mark
Published: (2021-01-01) -
An Innovative Longwall Mining Technology in Tangshan Coal Mine, China
by: Jingli Zhao, et al.
Published: (2017-01-01)