Development of the RACI Model for Processes of the Closure Phase in Construction Programs
Recently, the construction industry has seen an increase in construction program level projects in which a number of projects are carried out simultaneously. These projects thus require more systematic management than traditional management methods due to both their complexity and the diverse stakeh...
Main Authors: | Woo-yeon Lee, Seung-hoon Lee, Chengquan Jin, Chang-taek Hyun |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-02-01
|
Series: | Sustainability |
Subjects: | |
Online Access: | https://www.mdpi.com/2071-1050/13/4/1806 |
Similar Items
-
OPTIMIZATION OF DISTRIBUTION OF POWERS AND RESPONSIBILITY BY RACI TECHNIQUE
by: G. G. Nalbandian, et al.
Published: (2014-12-01) -
Analysis of Key Stakeholder Groups of Commercial Entities in the Czech Republic
by: Marie Slabá
Published: (2013-01-01) -
βPix is a new player in renal physiology
by: Kirk L. Hamilton, et al.
Published: (2012-07-01) -
Predictor Role of Profession in Explaining Personal Value Priorities and Conflicts between Construction Stakeholders
by: Babak Panahi, et al.
Published: (2015-11-01) -
Predictor Role of Profession in Explaining Personal Value Priorities and Conflicts between Construction Stakeholders
by: Babak Panahi, et al.
Published: (2015-11-01)