Study on Single-Machine Group Scheduling with Due-Window Assignment and Position-Dependent Weights
This article considers a single-machine group scheduling problem with due-window assignment, where the jobs are classified into groups and the jobs in the same group must be processed in succession. The goal is to minimize the weighted sum of lateness and due-window assignment cost, where the weight...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/2232696 |