Estimation of economic damages caused by the flood risk
In recent years, we have become increasingly aware of the importance of factoring the risk to people, property, the overall economy, and the environment from flooding into the planning system, and the role that good planning has in avoiding and reducing such risk that could otherwise arise in the...
Main Author: | Anca Dănilă |
---|---|
Format: | Article |
Language: | English |
Published: |
Naval Academy Press
2019-06-01
|
Series: | Scientific Bulletin of Naval Academy |
Subjects: | |
Online Access: | https://www.anmb.ro/buletinstiintific/buletine/2019_Issue1/03_NTM/95.pdf |
Similar Items
-
A Hydro-Informatic Approach For Estimation Of Design Flash-Flood In Bargi Dam Cross-Section Of Narmada River, India
by: Gurveek S. Maan, et al.
Published: (2020-06-01) -
THE JULY 2005 FLOOD IN VEDEA RIVER HYDROGRPAHIC BASIN IN JULY 2005
by: TOMA FLORENTINA-MARIANA
Published: (2013-03-01) -
Flood Risk Assessments: Applications and Uncertainties
by: Andrés Díez-Herrero, et al.
Published: (2020-07-01) -
A case study on estimating the flood severity using flood hydrographs for small ungauged catchments in Korea
by: Hyun Il Choi
Published: (2013-02-01) -
Flood Risk Analysis and Assessment, Applications and Uncertainties: A Bibliometric Review
by: Andrés Díez-Herrero, et al.
Published: (2020-07-01)