Pile group settlement analysis on the basis of Static Load Test
Settlement of large pile groups is most often estimated by the Alternative Foundation Method. However, this method has some limitations related to assumed uniformity of pile loads. A very big problem is also related to estimating the stiffness of subgrade loaded by a group of piles. Similar problems...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_04031.pdf |
id |
doaj-86d54c53f7c74c17bd9aa74aab6d14e4 |
---|---|
record_format |
Article |
spelling |
doaj-86d54c53f7c74c17bd9aa74aab6d14e42021-04-02T11:49:05ZengEDP SciencesE3S Web of Conferences2267-12422019-01-01970403110.1051/e3sconf/20199704031e3sconf_form2018_04031Pile group settlement analysis on the basis of Static Load TestDudek NikolaSettlement of large pile groups is most often estimated by the Alternative Foundation Method. However, this method has some limitations related to assumed uniformity of pile loads. A very big problem is also related to estimating the stiffness of subgrade loaded by a group of piles. Similar problems arise when piled foundation is numerically modelled in Finite Element Method or Boundary Element Method programmes. The results obtained are highly dependent on the input data, especially on characteristics describing soil subgrade stiffness and strength and moduli at pile – soil contact. The paper presents an example of using the results of trial static calculations for the pile made using a technology not identical with that ultimately implemented for the project. The subgrade stiffness modulus was determined with Inverse Analysis using bored pile test load. The results attained were used for further calculations (forecast) the settlement of prefabricated driven pile (a single one) and then to estimate of pile group settlement under full load from bridge structure abutment.https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_04031.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Dudek Nikola |
spellingShingle |
Dudek Nikola Pile group settlement analysis on the basis of Static Load Test E3S Web of Conferences |
author_facet |
Dudek Nikola |
author_sort |
Dudek Nikola |
title |
Pile group settlement analysis on the basis of Static Load Test |
title_short |
Pile group settlement analysis on the basis of Static Load Test |
title_full |
Pile group settlement analysis on the basis of Static Load Test |
title_fullStr |
Pile group settlement analysis on the basis of Static Load Test |
title_full_unstemmed |
Pile group settlement analysis on the basis of Static Load Test |
title_sort |
pile group settlement analysis on the basis of static load test |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2019-01-01 |
description |
Settlement of large pile groups is most often estimated by the Alternative Foundation Method. However, this method has some limitations related to assumed uniformity of pile loads. A very big problem is also related to estimating the stiffness of subgrade loaded by a group of piles. Similar problems arise when piled foundation is numerically modelled in Finite Element Method or Boundary Element Method programmes. The results obtained are highly dependent on the input data, especially on characteristics describing soil subgrade stiffness and strength and moduli at pile – soil contact. The paper presents an example of using the results of trial static calculations for the pile made using a technology not identical with that ultimately implemented for the project. The subgrade stiffness modulus was determined with Inverse Analysis using bored pile test load. The results attained were used for further calculations (forecast) the settlement of prefabricated driven pile (a single one) and then to estimate of pile group settlement under full load from bridge structure abutment. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/23/e3sconf_form2018_04031.pdf |
work_keys_str_mv |
AT dudeknikola pilegroupsettlementanalysisonthebasisofstaticloadtest |
_version_ |
1721571183078408192 |