MATERIAL REQUIREMENTS PLANNING IN TURKISH AIR FORCE
Accompanying with the activation of enterprise resource planning software (HvBS), the Turkish Air Force (TuAF) is having a fundamental change on its system sustainability approach. This change will show itself on the acquisition decisions as a result of switching to a system based requirements compu...
Main Author: | Çağlar Utku Güler |
---|---|
Format: | Article |
Language: | English |
Published: |
Hezarfen Aeronautics and Space Technologies Institue
2012-01-01
|
Series: | Havacılık ve Uzay Teknolojileri Dergisi |
Subjects: | |
Online Access: | http://www.jast.hho.edu.tr/JAST/index.php/JAST/article/view/245/233 |
Similar Items
-
Analysis of raw material inventory for insecticide packaging bottle with material requirement planning: a case study
by: Arinda Soraya Putri, et al.
Published: (2020-12-01) -
Demand Driven Material Requirements Planning (DDMRP): A systematic review and classification
by: Ahlam Azzamouri, et al.
Published: (2021-05-01) -
APLIKASI MATERIAL REQUIREMENT PLANNING UNTUK MENGENDALIKAN INVESTASI PENGADAAN MATERIAL PADA PT. JHS PILLING SYSTEM
by: Herry P. Chandra, et al.
Published: (2001-01-01) -
ANALISIS PERENCANAAN PERSEDIAAN BATUBARA FX DENGAN METODE MATERIAL REQUIREMENT PLANNING
by: Muhammad Arief, et al.
Published: (2018-12-01) -
A New Information System for Inventory Management in Hospitality Industry
by: Mune Moğol Sever, et al.
Published: (2021-06-01)