Calculation of Pollutant Load in Cipunagara River: Livestock Sector

Cipunagara is the largest watershed in Subang Regency with River Cipunagara as the mainstream. Previous works showed increased activities around Cipunagara watershed, especially in segment 3, leading to a decline in the water quality. The importance of this river increases due to the development pla...

Full description

Bibliographic Details
Main Authors: Iwan Juwana, Diki Prastyo Nugroho
Format: Article
Language:English
Published: Universitas Gadjah Mada 2020-05-01
Series:Journal of the Civil Engineering Forum
Subjects:
Online Access:https://jurnal.ugm.ac.id/jcef/article/view/52675
id doaj-83fedeff79c342ad938ff890c29bf61d
record_format Article
spelling doaj-83fedeff79c342ad938ff890c29bf61d2020-11-25T03:08:38ZengUniversitas Gadjah MadaJournal of the Civil Engineering Forum2581-10372549-59252020-05-016214515610.22146/jcef.5267526848Calculation of Pollutant Load in Cipunagara River: Livestock SectorIwan Juwana0Diki Prastyo Nugroho1Department of Environmental Engineering, Institut Teknologi Nasional (ITENAS)Department of Environmental Engineering, Institut Teknologi Nasional (ITENAS)Cipunagara is the largest watershed in Subang Regency with River Cipunagara as the mainstream. Previous works showed increased activities around Cipunagara watershed, especially in segment 3, leading to a decline in the water quality. The importance of this river increases due to the development plan of Sadawarna and Cilame Reservoirs, which are used for irrigation and other activities. This study aims to identify pollution sources and to analyze the capacity of Cipunagara River in relation to potential pollution load from the watershed for the next 5 years. The study focuses on livestock, which is one of the main sectors contributing to pollution. The main steps include segment selection, calculation of existing pollutant load and prediction within the next 5 years from livestock waste. The segment selection was based on the number of activities from several sectors, the spatial plan of the region, as well as the quality and quantity Cipunagara River. The calculation of existing pollutant load was based on actual pollutant and flow of the river, while the prediction of pollutant load relied on emission factor of each pollutant parameter. The results showed that pollution index in Cipunagara River was severe. The existing and the projected potential pollutant loads in segment 3 include 1,668.76 kg/day and 2,081.25 kg/day for BOD; 4,053.74 kg/day and 5,063.29 kg/day for COD; 8.72 kg/day and 13.34 kg/day for N-Total; and 1.75 kg/day and 2.16 kg/day for P-Total, respectively. These results can be used by the local governments to manage water quality of the river.https://jurnal.ugm.ac.id/jcef/article/view/52675cipunagara watershedpollution indexpollutant loadlivestockemission factor
collection DOAJ
language English
format Article
sources DOAJ
author Iwan Juwana
Diki Prastyo Nugroho
spellingShingle Iwan Juwana
Diki Prastyo Nugroho
Calculation of Pollutant Load in Cipunagara River: Livestock Sector
Journal of the Civil Engineering Forum
cipunagara watershed
pollution index
pollutant load
livestock
emission factor
author_facet Iwan Juwana
Diki Prastyo Nugroho
author_sort Iwan Juwana
title Calculation of Pollutant Load in Cipunagara River: Livestock Sector
title_short Calculation of Pollutant Load in Cipunagara River: Livestock Sector
title_full Calculation of Pollutant Load in Cipunagara River: Livestock Sector
title_fullStr Calculation of Pollutant Load in Cipunagara River: Livestock Sector
title_full_unstemmed Calculation of Pollutant Load in Cipunagara River: Livestock Sector
title_sort calculation of pollutant load in cipunagara river: livestock sector
publisher Universitas Gadjah Mada
series Journal of the Civil Engineering Forum
issn 2581-1037
2549-5925
publishDate 2020-05-01
description Cipunagara is the largest watershed in Subang Regency with River Cipunagara as the mainstream. Previous works showed increased activities around Cipunagara watershed, especially in segment 3, leading to a decline in the water quality. The importance of this river increases due to the development plan of Sadawarna and Cilame Reservoirs, which are used for irrigation and other activities. This study aims to identify pollution sources and to analyze the capacity of Cipunagara River in relation to potential pollution load from the watershed for the next 5 years. The study focuses on livestock, which is one of the main sectors contributing to pollution. The main steps include segment selection, calculation of existing pollutant load and prediction within the next 5 years from livestock waste. The segment selection was based on the number of activities from several sectors, the spatial plan of the region, as well as the quality and quantity Cipunagara River. The calculation of existing pollutant load was based on actual pollutant and flow of the river, while the prediction of pollutant load relied on emission factor of each pollutant parameter. The results showed that pollution index in Cipunagara River was severe. The existing and the projected potential pollutant loads in segment 3 include 1,668.76 kg/day and 2,081.25 kg/day for BOD; 4,053.74 kg/day and 5,063.29 kg/day for COD; 8.72 kg/day and 13.34 kg/day for N-Total; and 1.75 kg/day and 2.16 kg/day for P-Total, respectively. These results can be used by the local governments to manage water quality of the river.
topic cipunagara watershed
pollution index
pollutant load
livestock
emission factor
url https://jurnal.ugm.ac.id/jcef/article/view/52675
work_keys_str_mv AT iwanjuwana calculationofpollutantloadincipunagarariverlivestocksector
AT dikiprastyonugroho calculationofpollutantloadincipunagarariverlivestocksector
_version_ 1724665151633752064