Single Machine Group Scheduling with Position Dependent Processing Times and Ready Times
We investigate a single machine group scheduling problem with position dependent processing times and ready times. The actual processing time of a job is a function of positive group-dependent job-independent positional factors. The actual setup time of the group is a linear function of the total co...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2015/206230 |