A study on alternative method of self – starting generator using ESS
ESS is widely used in FR power system in Korea. In this paper, we propose a method of starting the supply generator by energizing the transmission line to the ESS instead of the self-starting generator when some area of the system is completely out of order. Simulation should be carried out to find...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2019-01-01
|
Series: | Journal of International Council on Electrical Engineering |
Subjects: | |
Online Access: | http://dx.doi.org/10.1080/22348972.2018.1558921 |
Summary: | ESS is widely used in FR power system in Korea. In this paper, we propose a method of starting the supply generator by energizing the transmission line to the ESS instead of the self-starting generator when some area of the system is completely out of order. Simulation should be carried out to find out whether there is any problem in replacing the self-starting generator with the ESS through the calculation of the power flow and the transient stability. We used EPRI ‘s CBEST model for simulation, and utilized actual system data of KEPCO. |
---|---|
ISSN: | 2234-8972 |