Application of Composite Deflecting Model in Horizontal Well Drilling

Based on current issues of difficulties in controlling horizontal well trajectory and high cost in drilling deflecting, a compound deflecting BHA (bottom hole assembly) with diameter-adjustable stabilizer (DAS) and bending-adjustable housing (BAH) is presented. According to the DAS operational princ...

Full description

Bibliographic Details
Main Authors: Shaohu Liu, Zhichao Zhu
Format: Article
Language:English
Published: Hindawi Limited 2020-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2020/4672738
id doaj-82c8075c58e942eda3c96818dc5b35da
record_format Article
spelling doaj-82c8075c58e942eda3c96818dc5b35da2020-11-25T03:32:10ZengHindawi LimitedMathematical Problems in Engineering1024-123X1563-51472020-01-01202010.1155/2020/46727384672738Application of Composite Deflecting Model in Horizontal Well DrillingShaohu Liu0Zhichao Zhu1School of Mechanical Engineering, Yangtze University, Jingzhou 434023, ChinaSchool of Mechanical Engineering, Yangtze University, Jingzhou 434023, ChinaBased on current issues of difficulties in controlling horizontal well trajectory and high cost in drilling deflecting, a compound deflecting BHA (bottom hole assembly) with diameter-adjustable stabilizer (DAS) and bending-adjustable housing (BAH) is presented. According to the DAS operational principles and the stress condition in operation, the computational formula of wedge’s axial moving displacement and piston’s radial telescopic displacement of the DAS driven by drilling fluid pressure is presented. This formula is verified by lab experimental simulation. Three-points-circle method is utilized to calculate geometrical build up rate of compound deflecting BHA, and the result is verified by field data. The method is utilized to make design and calculate for compound BHA. The research can be used as a reference for compound deflecting drilling in horizontal wells. The flow rate and pressure difference have a very serious impact on the flow regulator erosion, so the flow rate and pressure difference should be controlled when the DAS works, and it is suggested that the flow regulator should maintain and replace frequently when in service.http://dx.doi.org/10.1155/2020/4672738
collection DOAJ
language English
format Article
sources DOAJ
author Shaohu Liu
Zhichao Zhu
spellingShingle Shaohu Liu
Zhichao Zhu
Application of Composite Deflecting Model in Horizontal Well Drilling
Mathematical Problems in Engineering
author_facet Shaohu Liu
Zhichao Zhu
author_sort Shaohu Liu
title Application of Composite Deflecting Model in Horizontal Well Drilling
title_short Application of Composite Deflecting Model in Horizontal Well Drilling
title_full Application of Composite Deflecting Model in Horizontal Well Drilling
title_fullStr Application of Composite Deflecting Model in Horizontal Well Drilling
title_full_unstemmed Application of Composite Deflecting Model in Horizontal Well Drilling
title_sort application of composite deflecting model in horizontal well drilling
publisher Hindawi Limited
series Mathematical Problems in Engineering
issn 1024-123X
1563-5147
publishDate 2020-01-01
description Based on current issues of difficulties in controlling horizontal well trajectory and high cost in drilling deflecting, a compound deflecting BHA (bottom hole assembly) with diameter-adjustable stabilizer (DAS) and bending-adjustable housing (BAH) is presented. According to the DAS operational principles and the stress condition in operation, the computational formula of wedge’s axial moving displacement and piston’s radial telescopic displacement of the DAS driven by drilling fluid pressure is presented. This formula is verified by lab experimental simulation. Three-points-circle method is utilized to calculate geometrical build up rate of compound deflecting BHA, and the result is verified by field data. The method is utilized to make design and calculate for compound BHA. The research can be used as a reference for compound deflecting drilling in horizontal wells. The flow rate and pressure difference have a very serious impact on the flow regulator erosion, so the flow rate and pressure difference should be controlled when the DAS works, and it is suggested that the flow regulator should maintain and replace frequently when in service.
url http://dx.doi.org/10.1155/2020/4672738
work_keys_str_mv AT shaohuliu applicationofcompositedeflectingmodelinhorizontalwelldrilling
AT zhichaozhu applicationofcompositedeflectingmodelinhorizontalwelldrilling
_version_ 1715188634659848192