Space zoning concept-based scheduling model for repetitive construction process
Many researchers have studied effective space zoning to reduce the duration of a construction project and interference among work tasks. These studies, however, attempted to plan the construction schedule using the space zoning concept based on network-based scheduling methods. Accordingly, it was...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Vilnius Gediminas Technical University
2013-06-01
|
Series: | Journal of Civil Engineering and Management |
Subjects: | |
Online Access: | http://journals.vgtu.lt/index.php/JCEM/article/view/3861 |
id |
doaj-8127e125729b46d098716b18abd647c7 |
---|---|
record_format |
Article |
spelling |
doaj-8127e125729b46d098716b18abd647c72021-07-02T01:53:06ZengVilnius Gediminas Technical UniversityJournal of Civil Engineering and Management1392-37301822-36052013-06-0119310.3846/13923730.2012.757561Space zoning concept-based scheduling model for repetitive construction processKyuman Cho0Taehoon Hong1Chang Taek Hyun2Department of Architectural Engineering, Chosun University, Gwangju, KoreaDepartment of Architectural Engineering, Yonsei University, Seoul, KoreaDepartment of Architectural Engineering, University of Seoul, Seoul, Korea Many researchers have studied effective space zoning to reduce the duration of a construction project and interference among work tasks. These studies, however, attempted to plan the construction schedule using the space zoning concept based on network-based scheduling methods. Accordingly, it was difficult to reflect the representative characteristics of space zoning, such as iteration and overlapping. To overcome such limitations of existing methodologies and to achieve schedule reduction of a construction project by maximizing productivity, a Space zoning Concept-based scHEduling ModEl (SCHEME) for repetitive construction processes that adopt simulation techniques was developed in this study. The result of the application of the developed model to actual construction cases shows that the model reflects well the space-zoning characteristics, and in terms of the reduction of the construction duration, the model yielded a superior outcome in nonspace-zoning cases. The model developed in this study is expected to produce an excellent effect on the repetitive construction processes, in terms of construction duration. http://journals.vgtu.lt/index.php/JCEM/article/view/3861space zoningschedulingcomputer aided simulationprocess model |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Kyuman Cho Taehoon Hong Chang Taek Hyun |
spellingShingle |
Kyuman Cho Taehoon Hong Chang Taek Hyun Space zoning concept-based scheduling model for repetitive construction process Journal of Civil Engineering and Management space zoning scheduling computer aided simulation process model |
author_facet |
Kyuman Cho Taehoon Hong Chang Taek Hyun |
author_sort |
Kyuman Cho |
title |
Space zoning concept-based scheduling model for repetitive construction process |
title_short |
Space zoning concept-based scheduling model for repetitive construction process |
title_full |
Space zoning concept-based scheduling model for repetitive construction process |
title_fullStr |
Space zoning concept-based scheduling model for repetitive construction process |
title_full_unstemmed |
Space zoning concept-based scheduling model for repetitive construction process |
title_sort |
space zoning concept-based scheduling model for repetitive construction process |
publisher |
Vilnius Gediminas Technical University |
series |
Journal of Civil Engineering and Management |
issn |
1392-3730 1822-3605 |
publishDate |
2013-06-01 |
description |
Many researchers have studied effective space zoning to reduce the duration of a construction project and interference among work tasks. These studies, however, attempted to plan the construction schedule using the space zoning concept based on network-based scheduling methods. Accordingly, it was difficult to reflect the representative characteristics of space zoning, such as iteration and overlapping. To overcome such limitations of existing methodologies and to achieve schedule reduction of a construction project by maximizing productivity, a Space zoning Concept-based scHEduling ModEl (SCHEME) for repetitive construction processes that adopt simulation techniques was developed in this study. The result of the application of the developed model to actual construction cases shows that the model reflects well the space-zoning characteristics, and in terms of the reduction of the construction duration, the model yielded a superior outcome in nonspace-zoning cases. The model developed in this study is expected to produce an excellent effect on the repetitive construction processes, in terms of construction duration.
|
topic |
space zoning scheduling computer aided simulation process model |
url |
http://journals.vgtu.lt/index.php/JCEM/article/view/3861 |
work_keys_str_mv |
AT kyumancho spacezoningconceptbasedschedulingmodelforrepetitiveconstructionprocess AT taehoonhong spacezoningconceptbasedschedulingmodelforrepetitiveconstructionprocess AT changtaekhyun spacezoningconceptbasedschedulingmodelforrepetitiveconstructionprocess |
_version_ |
1721344175454027776 |