Space zoning concept-based scheduling model for repetitive construction process

Many researchers have studied effective space zoning to reduce the duration of a construction project and interference among work tasks. These studies, however, attempted to plan the construction schedule using the space zoning concept based on network-based scheduling methods. Accordingly, it was...

Full description

Bibliographic Details
Main Authors: Kyuman Cho, Taehoon Hong, Chang Taek Hyun
Format: Article
Language:English
Published: Vilnius Gediminas Technical University 2013-06-01
Series:Journal of Civil Engineering and Management
Subjects:
Online Access:http://journals.vgtu.lt/index.php/JCEM/article/view/3861
id doaj-8127e125729b46d098716b18abd647c7
record_format Article
spelling doaj-8127e125729b46d098716b18abd647c72021-07-02T01:53:06ZengVilnius Gediminas Technical UniversityJournal of Civil Engineering and Management1392-37301822-36052013-06-0119310.3846/13923730.2012.757561Space zoning concept-based scheduling model for repetitive construction processKyuman Cho0Taehoon Hong1Chang Taek Hyun2Department of Architectural Engineering, Chosun University, Gwangju, KoreaDepartment of Architectural Engineering, Yonsei University, Seoul, KoreaDepartment of Architectural Engineering, University of Seoul, Seoul, Korea Many researchers have studied effective space zoning to reduce the duration of a construction project and interference among work tasks. These studies, however, attempted to plan the construction schedule using the space zoning concept based on network-based scheduling methods. Accordingly, it was difficult to reflect the representative characteristics of space zoning, such as iteration and overlapping. To overcome such limitations of existing methodologies and to achieve schedule reduction of a construction project by maximizing productivity, a Space zoning Concept-based scHEduling ModEl (SCHEME) for repetitive construction processes that adopt simulation techniques was developed in this study. The result of the application of the developed model to actual construction cases shows that the model reflects well the space-zoning characteristics, and in terms of the reduction of the construction duration, the model yielded a superior outcome in nonspace-zoning cases. The model developed in this study is expected to produce an excellent effect on the repetitive construction processes, in terms of construction duration. http://journals.vgtu.lt/index.php/JCEM/article/view/3861space zoningschedulingcomputer aided simulationprocess model
collection DOAJ
language English
format Article
sources DOAJ
author Kyuman Cho
Taehoon Hong
Chang Taek Hyun
spellingShingle Kyuman Cho
Taehoon Hong
Chang Taek Hyun
Space zoning concept-based scheduling model for repetitive construction process
Journal of Civil Engineering and Management
space zoning
scheduling
computer aided simulation
process model
author_facet Kyuman Cho
Taehoon Hong
Chang Taek Hyun
author_sort Kyuman Cho
title Space zoning concept-based scheduling model for repetitive construction process
title_short Space zoning concept-based scheduling model for repetitive construction process
title_full Space zoning concept-based scheduling model for repetitive construction process
title_fullStr Space zoning concept-based scheduling model for repetitive construction process
title_full_unstemmed Space zoning concept-based scheduling model for repetitive construction process
title_sort space zoning concept-based scheduling model for repetitive construction process
publisher Vilnius Gediminas Technical University
series Journal of Civil Engineering and Management
issn 1392-3730
1822-3605
publishDate 2013-06-01
description Many researchers have studied effective space zoning to reduce the duration of a construction project and interference among work tasks. These studies, however, attempted to plan the construction schedule using the space zoning concept based on network-based scheduling methods. Accordingly, it was difficult to reflect the representative characteristics of space zoning, such as iteration and overlapping. To overcome such limitations of existing methodologies and to achieve schedule reduction of a construction project by maximizing productivity, a Space zoning Concept-based scHEduling ModEl (SCHEME) for repetitive construction processes that adopt simulation techniques was developed in this study. The result of the application of the developed model to actual construction cases shows that the model reflects well the space-zoning characteristics, and in terms of the reduction of the construction duration, the model yielded a superior outcome in nonspace-zoning cases. The model developed in this study is expected to produce an excellent effect on the repetitive construction processes, in terms of construction duration.
topic space zoning
scheduling
computer aided simulation
process model
url http://journals.vgtu.lt/index.php/JCEM/article/view/3861
work_keys_str_mv AT kyumancho spacezoningconceptbasedschedulingmodelforrepetitiveconstructionprocess
AT taehoonhong spacezoningconceptbasedschedulingmodelforrepetitiveconstructionprocess
AT changtaekhyun spacezoningconceptbasedschedulingmodelforrepetitiveconstructionprocess
_version_ 1721344175454027776