A Hybrid Heuristic Algorithm for Ship Block Construction Space Scheduling Problem
Ship block construction space is an important bottleneck resource in the process of shipbuilding, so the production scheduling optimization is a key technology to improve the efficiency of shipbuilding. With respect to ship block construction space scheduling problem, a hybrid heuristic algorithm is...
Main Authors: | Shicheng Hu, Tengjiao Liu, Song Wang, Yonggui Kao, Xuedong Sun |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2015/841637 |
Similar Items
-
A Branch and Bound Algorithm for Project Scheduling Problem with Spatial Resource Constraints
by: Shicheng Hu, et al.
Published: (2015-01-01) -
A Heuristic Algorithm based on Block Mining and Recombination for Flow Shop Scheduling Problem
by: Chen-Yu Kao, et al. -
Ship Block Transportation Scheduling Problem Based on Greedy Algorithm
by: Chong Wang, et al.
Published: (2016-05-01) -
An Iterated Local Search Algorithm for a Place Scheduling Problem
by: Shicheng Hu, et al.
Published: (2013-01-01) -
Heuristic Algorithm for Workforce Scheduling Problems
by: Carlos Montoya, et al.
Published: (2010-02-01)