Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space

The research aim is establishment of effective parameters for mining of flooded bench by a hydro-mechanized complex with dumping of enclosing rocks in a sludge pond of pit residual space. The established research results make it possible to choose the effective width of the dredger mining cut at the...

Full description

Bibliographic Details
Main Authors: Sobko Borys, Lozhnikov Oleksii, Drebenshtedt Carsten
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/28/e3sconf_rmget2020_00037.pdf
id doaj-7e344bd3821140189dfad2ea9915b84e
record_format Article
spelling doaj-7e344bd3821140189dfad2ea9915b84e2021-04-02T15:07:20ZengEDP SciencesE3S Web of Conferences2267-12422020-01-011680003710.1051/e3sconf/202016800037e3sconf_rmget2020_00037Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual spaceSobko Borys0Lozhnikov Oleksii1Drebenshtedt Carsten2Motronovskyi Mining Processing PlantDnipro University of Technology, Department of Surface MiningTU Bergakademie Freiberg, Institute of Surface Mining and Special StructureThe research aim is establishment of effective parameters for mining of flooded bench by a hydro-mechanized complex with dumping of enclosing rocks in a sludge pond of pit residual space. The established research results make it possible to choose the effective width of the dredger mining cut at the hydromechanical method, taking into account the volume of the excavation and dump pipeline movements. Two technological schemes for the formation of a sludge pond in the pit residual space are proposed, they differ in the direction of the sludge pond movement relatively to the pit front. The established dependence of the number of movements of the sludge pond pipeline on the width of the dump pass allows to choose its effective value, taking into account the number of discharge pipes. Based on the dependence of the average monthly excavation volume and the number of movements of sludge pond pipeline on the width of cut face, the optimal number of discharge pipes is established. The research results allow establishing the effective dredger width of the sludge pond and the number of discharge pipes provided that a transverse or longitudinal pass at the internal sludge pond formation is applied during the mining.https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/28/e3sconf_rmget2020_00037.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Sobko Borys
Lozhnikov Oleksii
Drebenshtedt Carsten
spellingShingle Sobko Borys
Lozhnikov Oleksii
Drebenshtedt Carsten
Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space
E3S Web of Conferences
author_facet Sobko Borys
Lozhnikov Oleksii
Drebenshtedt Carsten
author_sort Sobko Borys
title Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space
title_short Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space
title_full Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space
title_fullStr Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space
title_full_unstemmed Investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space
title_sort investigation of the influence of flooded bench hydraulic mining parameters on sludge pond formation in the pit residual space
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2020-01-01
description The research aim is establishment of effective parameters for mining of flooded bench by a hydro-mechanized complex with dumping of enclosing rocks in a sludge pond of pit residual space. The established research results make it possible to choose the effective width of the dredger mining cut at the hydromechanical method, taking into account the volume of the excavation and dump pipeline movements. Two technological schemes for the formation of a sludge pond in the pit residual space are proposed, they differ in the direction of the sludge pond movement relatively to the pit front. The established dependence of the number of movements of the sludge pond pipeline on the width of the dump pass allows to choose its effective value, taking into account the number of discharge pipes. Based on the dependence of the average monthly excavation volume and the number of movements of sludge pond pipeline on the width of cut face, the optimal number of discharge pipes is established. The research results allow establishing the effective dredger width of the sludge pond and the number of discharge pipes provided that a transverse or longitudinal pass at the internal sludge pond formation is applied during the mining.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/28/e3sconf_rmget2020_00037.pdf
work_keys_str_mv AT sobkoborys investigationoftheinfluenceoffloodedbenchhydraulicminingparametersonsludgepondformationinthepitresidualspace
AT lozhnikovoleksii investigationoftheinfluenceoffloodedbenchhydraulicminingparametersonsludgepondformationinthepitresidualspace
AT drebenshtedtcarsten investigationoftheinfluenceoffloodedbenchhydraulicminingparametersonsludgepondformationinthepitresidualspace
_version_ 1721560589817348096